All information, illustrations and technical specifications in this publication correspond to the latest version as per the
time of publishing. Constructions and designs are subject to modifications without prior notice.
21
4.0. Operating
4.3.
INSTALLATION OF DIRT CONTAINER
•
Demount hydraulic
cylinder (A).
•
Install bar (B) in the
place of the hydraulic
cylinder. The mechanical
tangential deviation of the
sweeping machine can be set
using the bar.
•
Attach container (C) to
hooks (D).
•
Insert and secure hydraulic
cylinder (A) to mounting
links (E) of guard plate
and container
•
The supplied extension (F)
is for the park supports.
4.4.
INSTALLING LATERAL BROOM
•
Screw on V-belt pulley (A)
to attachment (B) on the
right of side part.
•
Insert V-belt into the
profile of the V-belt
pulley.
•
Insert lateral broom
retainer (C) with the
screws to side part
(middle slot) and secure
with nuts.
•
Release nuts to retension.
Push lateral broom
retainer forward. Secure
setting by tightening the
nuts.