background image

11

2.

The shower unit 

must be earthed

 by connecting the supply cable

earth conductor to the earth terminal.

Supplementary bonding:

 Within the bathroom or shower room,

all accessible conductive parts of electrical equipment and
extraneous conductive parts that are likely to introduce earth
potential, must be electrically bonded to earth using a minimum
cable size of 4.0 mm

2  

if the cable is not mechanically protected

(2.5 mm

2

 if mechanically protected).

3.

Power supply cable 

must 

have a minimum  cross sectional area

of 1 mm².

4.

Power supply 

must

 be 230–240 V at 50 Hz. The isolating switch

must

 be double pole switched, fused at 3 Amps, with at least a

3 mm contact separation gap to each pole.

5.

Do not

 turn the electrical supply on until all plumbing connections

have been made and the shower unit has been commissioned as
the unit 

must not

 be operated dry.

6.

A 30 mA RCD (residual current device) 

must

 be fitted. This may

be part of the consumer unit or a separate unit.

7.

Fuses do not give personal protection against electric shock.

Plumbing

1.

The plumbing installation must comply with the requirements of
UK Water Regulations/Bylaws (Scotland), Building Regulations
or any particular regulations and practices, specified by the local
water company or water undertakers. The installation should be
carried out by a plumber or contractor who is registered with, or is
a member of an association such as:

Institute of Plumbing (IOP), throughout the UK.
National Association of Plumbing, Heating and Mechanical
Services Contractors (NAPH & MSC), England and Wales.
Scottish and Northern Ireland Plumbing Employers’ Federation
(SNIPEF), Scotland and Northern Ireland.

2.

minimum

 storage capacity of cold water of 230 litres (50 gallons)

is required to provide adequate showering time. Insufficient storage
may result in the pump being run dry.

3.

Layout and sizing of pipework 

must 

be such that nominally equal

inlet supply pressures are achieved and the effects on the shower
performance of other draw-offs are minimised.

 

Ensure the shower

unit is the first draw-off from the water supply.

Содержание AQUATRONIC POWER

Страница 1: ...1 PRODUCT MANUAL INSTALLER Please leave this manual with the user for future reference to unit operation and maintenance THERMOSTATIC SHOWER...

Страница 2: ...ant Safety Information 3 Pack Contents 6 Dimensions 7 Specifications 8 Installation Requirements 9 Installation 10 Commissioning 18 Operation 22 Fault Diagnosis 23 Maintenance 26 Spare Parts 27 Guaran...

Страница 3: ...us are safe and without risk provided they are installed used and maintained in good working order in accordance with our instructions and recommendations 2 THIS APPLIANCE MUST BE EARTHED ENSURE SUPPL...

Страница 4: ...nce indicating a need for maintenance The appliance is frozen 11 Turn off the electrical and water supplies before removing the cover The electricity must be turned off at the mains and if applicable...

Страница 5: ...ers The installation should be carried out by a plumber or contractor who is registered with or is a member of an association such as Institute of Plumbing IOP throughout the UK National Association o...

Страница 6: ...stallation PACK CONTENTS 1 x Thermostatic Power Shower 4 x Case Inserts 1 x Flow Control Knob 1 x Temperature Control Knob 1 x Temperature Indicator Trim 1 x Push Fit Release Tool 3 x Rubber Wall Plug...

Страница 7: ...7 DIMENSIONS All dimensions are nominal and in millimetres 310 80 2 66 2 28 210 28 20 20 130 1 88...

Страница 8: ...minimise the deposition of scale in hard water areas Temperature Control The maximum temperature stop is set to 41 C Depressing the override button overrides the maximum temperature and allows the sh...

Страница 9: ...The duty cycle is 15 minutes on 45 minutes off Under normal operating conditions the thermal trip is unlikely to be activated Noise The acoustic noise from the pump motor has been reduced with the use...

Страница 10: ...the spillover level of the shower tray bath and the handset This is to prevent backsiphonage 7 Avoid layouts where the hose will be sharply kinked This may reduce the life of the hose 8 The shower un...

Страница 11: ...consumer unit or a separate unit 7 Fuses do not give personal protection against electric shock Plumbing 1 The plumbing installation must comply with the requirements of UK Water Regulations Bylaws S...

Страница 12: ...plating from the last 25 mm of the tube to ensure a good seal 11 15 mm polythene plastic pipe suitable for hot water may be used to supply the shower unit but internal pipe supports must be used 12 Su...

Страница 13: ...fitted to stop access to the inside of the unit 3 Fit the blanking plates to the unit case in the following manner For Top Inlet Pipework For Bottom Inlet Pipework For Rear Inlet Pipework Fit the full...

Страница 14: ...appropriate blanking plug by hand 6 Position the shower unit on the wall and mark through the three fixing points Note Installersmaywishtoobtain alternativeproprietarycavityfixings for dry lined stud...

Страница 15: ...erse 11 Hot and cold inlet supply connections are Hot Left Cold Right Run the hot and cold water supply pipes at 28 mm centres ensuring that the pipe ends project 30 mm into the inlet manifold Caution...

Страница 16: ...te PTFE tape or liquid jointing is not required to assist connection 14 The inlet manifold collet and O seals will seal automatically Warning The shower unit must be fixed to the wall at all three fix...

Страница 17: ...o the off position Turn the gearwheelanticlockwiseuntilthe geardrivemicroswitchemitsaclick noise to indicate the gear drive is in the off position 18 Refit the unit cover and secure with the three cov...

Страница 18: ...unit Caution Do not over tighten 2 Turn on the water supplies and check for leaks 4 Turn the outer flow control anticlockwise to full flow 5 Rotate the inner temperature control anticlockwise to check...

Страница 19: ...wise to the maximum temperature stop Do not depress the override button 3 Check the shower temperature 4 If the maximum temperature requires adjustment then remove the flow and temperature control kno...

Страница 20: ...when turning the temperature knob DO NOT USE FORCE to turn the knob any further as this will DAMAGE internal components 10 Checkthetemperaturecontrolcan fully turn in both directions 11 Check the max...

Страница 21: ...of the push fit release tool under the flow control knob and lever the control knob assembly off the shower unit 3 Unclip the concealed end of the override button from the temperature indicator trim...

Страница 22: ...emperature control anticlockwise for warmer water and clockwise for cooler water the numbers indicate the relative temperature 1 Cold 4 Tepid 7 Hot Warning Operation of the override button will allow...

Страница 23: ...not exceed 65 C Maximum showering temperature too hot Maximum temperature incorrectly set Reset maximum temperature Refer to COMMISSIONING Malfunction Cause Remedy Maximum temperature incorrectly set...

Страница 24: ...hen other hot taps are in use Less evident on full cold Air is being sucked down the vent pipe as the hot take off to the shower is too high up the pipe Refer to INSTALLATION REQUIREMENTS for the corr...

Страница 25: ...edly contact customer service for further advice Hot water cylinder temperature less than 120 C above the showering temperature Spray plate blocked Inlet filters blocked Clean the inlet filters Maximu...

Страница 26: ...ated or plastic fittings These finishes should be cleaned with a mild washing up detergent or soap solution and then wiped dry using a soft cloth MAINTENANCE Malfunction Cause Remedy Pump does not sto...

Страница 27: ...onents identified D 453 14 Filter Cap Assembly 453 15 Seal Pack components identified E 453 20 Control Knob Assembly Aquatronic Thermostatic 453 23 Mixer Valve Body components identified F 453 24 Inse...

Страница 28: ...cordance with this manual If the fault can not be resolved please contact the Customer Service Department who will try to assist or will arrange a local Service Engineer or Agent to call and arrange a...

Отзывы: