![background image](http://html1.mh-extra.com/html/whitlenge/calypso-9-mk-2/calypso-9-mk-2_installation-and-operation-instructions_977305003.webp)
CELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERS
INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.
NOTE:
NOTE:
NOTE:
NOTE:
NOTE:
The unit should be installed and serviced by a suitably trained person.
1.
Unpack the unit from its transportation packaging and visually inspect for signs of
damage.
2.
Site the unit in a convenient location in the Room where it is to be Sited and make sure
that a Mains Electricity Supply is within 2 metres. This unit should be sited to allow
free circulation of air. The unit should be fitted with a correctly fused and wired plug
with a fuse specified according to model or a standard Euro plug to IEC 83: 1975.
NOTE:
NOTE:
NOTE:
NOTE:
NOTE:
Sealed plugs may be fitted on new units.
3.
Fill the water bath with clean water until the overflow level is reached.
4.
Ensure that the recirc pump is switched off/disconnected.
5.
Turn on the unit and allow to start building the ice bank.
6.
Run the python to the bar area and complete dispense head plumbing installation.
7.
Ensure that the recirc pump is still off/disconnected.
8.
Connect all product lines using suitable fittings and connect water recirc flow and return
lines. Make sure all lines are well insulated and avoid running cool lines near hot water
pipes and heat sources.
9.
Observe joints for any leaks.
10.
Turn on/reconnect the recirc pump.
11.
The system is now ready.
FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:
CALYPSO
5
10 A
CALYPSO
9
10 A
CALYPSO
12 10 A
Содержание CALYPSO 9 Mk 2
Страница 2: ......