UV100, UV200 INSTALLATION & OPERATION MANUAL
4
IMPORTANT:
The device must be installed in compliance
with all national and local electrical and
mechanical codes. Failure to do so will void
UL safety listing and White-Rodgers warranty.
Standard Mounting
(Fig.5)
Remove the cover of the device and mount
the base to the air handling system using the
included sheet metal screws.
Using the mounted base as a template, use a
1.5" bit or holecutter to make the lamp hole(s)
required. Use a 1/4" bit to drill viewport
hole(s).
Fig. 5 Mount the device using included sheet metal screws.
Sharp Edge Hazard.
Be careful of sharp edges on device and
HVAC equipment while installing the device.
Personal injury may result.
CAUTION
Drill the lamp and viewport
hole for UV100.
Drill the lamp and viewport
holes for UV200.
Fiberboard Mounting
(Fig.5)
For fiberboard installations two sheet metal
straps, suitable length #6 or #8 screws/nuts
are required (not included). See template on
page 5 for strap construction.
Remove the cover and use the base as a tem-
plate for drilling or cutting lamp and viewport
holes into the fiberboard. Use a 6" holecutter
to make access holes to attach the straps to
the base.
Note: Do not make lamp holes smaller than 1.5".
Attach base as shown in Fig. 6.
Fig. 6 Mount the device to metal straps using #6-#8
screws/nuts. (Straps and needed screws are not included.)
Fiberboard
Metal Straps