White Rodgers Comfort Plus SST1000 Скачать руководство пользователя страница 12

12

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

POWER SUPPLY

CHECKOUT PROCEDURE

CHECKOUT PROCEDURE

CHECKOUT PROCEDURE

CHECKOUT PROCEDURE

CHECKOUT PROCEDURE

1.

Turn power switch to the “OFF” position and remove
the power pack from cabinet.

2.

If air flow switch is installed, locate air flow switch and
remove power pack cover. If air flow switch is not
installed, go to step 4.

3.

Disconnect the three-pin plastic connector and jumper
the two female pins (white wire to white-brown wire)
as shown in Fig. 23.

Jumper Lead

Female Pins

Male Pin

Plastic Connector

Method of jumping lead wires of 
connector plug from air flow switch.

Figure 23

4.

Place power pack on a well insulated workbench.
Connect meter negative (-) lead to the sheet metal
chassis and the high voltage probe to high voltage
contact on back cover of power pack. Connect AC
power to power pack using an extension cord and turn
power switch to the “ON” position. Keep hands and

Keep hands and

Keep hands and

Keep hands and

Keep hands and

tools away from high voltage contact.

tools away from high voltage contact.

tools away from high voltage contact.

tools away from high voltage contact.

tools away from high voltage contact.

5.

If Operating Light comes ON and output voltage is
between 6100 and 6800 VDC, power supply is good.

6.

If voltage is good but Operating Light does not come
on, replace Operating Light.

CELL TEST

CELL TEST

CELL TEST

CELL TEST

CELL TEST

1.

Place collecting cell on a well insulated workbench
with the cell contact button pointing upward.

2.

Select a power pack (with air flow switch bypassed
and ozone reduction jumper intact) that reads be-
tween 6100 and 6800 VDC at the cell contact with no
cell attached.

3.

Place power pack on top of  collecting cell ensuring
that there is proper contact between the cell contact
on the power pack contact.

4.

Using a standard extension cord, apply 120 VAC to
power pack. Turn power switch to “ON” position.

5.

Connect meter negative (-) lead to metal frame of
collecting cell. Use high voltage probe to measure
voltage at collecting cell ionizer or cell plates. Voltage
should be 6100 to 6800 VDC.

NOTE:

NOTE:

NOTE:

NOTE:

NOTE: A new “out-of-box” cell may cause the voltage
to be lower than normal for a short period of time. To
obtain a more accurate measurement, “age” the cell
by applying high voltage to the cell for 15 to 30
minutes.

6

If voltage is below 6100 VDC, check cell for foreign
objects, bowed/bent/loose plates, broken ionizing
wires or cracked insulators. Wash cells if required. If
Operating Light remains OFF, replace collecting cell.

AIR FLOW MONITOR TEST

AIR FLOW MONITOR TEST

AIR FLOW MONITOR TEST

AIR FLOW MONITOR TEST

AIR FLOW MONITOR TEST

1.

Connect a multimeter set to read 120 VAC to power
supply terminals marked “LINE.”

2.

Connect 120 VAC to power pack plug, turn power
switch “ON.”

3.

Blow on thermistor at air flow monitor. 120 VAC
should appear at multimeter. Stop blowing and volt-
age should disappear in 10 - 15 seconds.

4.

If voltage did not appear (Step 3), disconnect power to
power pack. Locate air flow switch and remove power
pack cover. Disconnect the three-pin plastic connec-
tor. Jumper the two female pins (white wire to white-
brown wire) as shown in Fig. 23. Reconnect power to
power pack. Turn power switch “ON.”

A. If 120 VAC appears at multimeter, replace air flow

monitor.

B. If 120 VAC does not appear on multimeter, prob-

lem is other than air flow monitor. Recheck all
primary wiring.

NOTE: The air flow monitor is designed to operate in the
temperature range of 65° to 120° F. Operation outside this
range is not recommended.

Содержание Comfort Plus SST1000

Страница 1: ...rts Repair Parts Repair Parts Repair Parts Repair Parts PART NO 37 6373F PART NO 37 6373F PART NO 37 6373F PART NO 37 6373F PART NO 37 6373F Replaces 37 6373E 0631 Please read and familiarize yourself...

Страница 2: ...Installation of this unit must comply with local electric Installation of this unit must comply with local electric Installation of this unit must comply with local electric Installation of this unit...

Страница 3: ...ot be removed by an Electronic Air Cleaner or by any other filtration media designed to remove airborne particles However some gases can be absorbed by an activated carbon filter or diluted with fresh...

Страница 4: ...5 If the air cleaner has a power cord installed unit must be located close enought to the outlet so connection can be made without the use of an extension cord If your furnace duct system has a pre i...

Страница 5: ...ing If duct connection to furnace allows less than nine inches for mounting the air cleaner shorten the lateral trunk or attach an offset fitting to the elbow HORIZONTAL FURNACE HORIZONTAL FURNACE HOR...

Страница 6: ...the furnace If necessary enlarge the opening in the furnace if possible to match the opening in the cabinet Ifthefurnaceopeningcannotbeenlarged atransition fitting should be used Figure 3 The cabinet...

Страница 7: ...ectors prop erly installed and grommets used to prevent wire abrasion Vertical Section Wood Block Tape All Joints Figure 16 Hot Neutral Grounding Conductor Front View Figure 17 Cabinet Pre Filters Han...

Страница 8: ...f the noise is objectionable push the ON OFF switch to the OFF position and allow additional time for cell s and pre filter s to dry In some cases the Operating Light will remain OFF during this initi...

Страница 9: ...Make sure wire is securely anchored at each end Support Ionizing Wire Figure 21 Rated Capacity 600 1200 cfm 1000 1600 cfm 1000 2000 cfm 1600 2200 cfm Max Pressure Drop 08 in W G 08 in W G 12 in W G 0...

Страница 10: ...misaligned ted misaligned Blower OFF A Remove power pack and clear contamination inside black bushing around Operating Light ON the small sensor element B Ensure small sensor element is centered in bu...

Страница 11: ...rovider Failure to do so could result in reduced perfor Failure to do so could result in reduced perfor Failure to do so could result in reduced perfor Failure to do so could result in reduced perfor...

Страница 12: ...th no cell attached 3 Place power pack on top of collecting cell ensuring that there is proper contact between the cell contact on the power pack contact 4 Using a standard extension cord apply 120 VA...

Страница 13: ...cting cell 2 Insert the two collecting cells into the cabinet behind the pre filters Be sure ionizing wires are directly behind the pre filters so the particles can be charged as soon as the air leave...

Страница 14: ...14 15 18 REP REP REP REP REPAIR P AIR P AIR P AIR P AIR PAR AR AR AR ARTS TS TS TS TS...

Страница 15: ...2 F858 1002 F858 1002 F858 1002 15 Cover Power Pack F16 8520 F16 8520 F16 8521 F16 8521 16 Manual 37 6373 37 6373 37 6373 37 6373 17 Charcoal Filter with mounting clips F825 0466 F825 0467 F825 0468 F...

Страница 16: ...lesaler or Original Equipment Manufac turer Sincerely White Rodgers Year JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 20___ 20___ 20___ 20___ 20___ 20___ 20___ 20___ 20___ 20___ 20___ 20___ WASH RE...

Отзывы: