background image

Page 7

22992-0-1106

Locating Firebox

Place firebox in framing opening. Use the four (4) framing brackets 

provided on the firebox to attach firebox to framing. Different hole 

locations can be used for finishing materials with thicknesses of 

3/8", 1/2" and 3/4". Attach these materials with screws provided, 

two (2) per framing bracket. 

See Figure 8.

Framing brackets should fit directly against framing material. Use 

at least one (1) nail per bracket to secure in place.
Check squareness of the firebox prior to securing to framed opening. 

See Figure 9.

Figure 8

A black hood that is furnished with each firebox (or optional hood) 

MUST be installed before the firebox is used. Failure to do so may 

create a possible fire hazard. The hood is located behind upper 

louver, or inside the firebox on flush face units. If brass, stainless 

steel, or hammered pewter hoods are desired, they can be purchased 

as an option. Attachment is the same as the standard black hood.

Flush Face Models

1. On flush face models, loosen the two screws (A) holding firebox 

top to face panel, then slide the hood flange between the firebox 

top and face panel and re-tighten the screws.

2. Install one (1) screw at each end of the hood as shown (C).

Louvered Models

1. If you have a louvered model, remove upper louver.
2. Place the top hood flange on top of the firebox, then install three 

screws through the firebox top from below and screw into the 
pilot holes in the hood flange (B).

3. Install one (1) screw at each end of the hood as shown (C).
4. Re-install louver.

Caution:

 The hood must be installed prior to operation of appliance. 

See Figure 10

ATTACH (4)

FRAMING BRACKETS

TO SIDES OF FIREBOX

PRIOR TO INSTALLING

UNIT TO FRAMED OPENING

A

C

A

C

B

C

B

C

B

Louvered Models

Flush Face Models

Figure 10

FIREBOX OPENING

CHECK TO SEE

THAT BOX IS SQUARE

PRIOR TO ATTACHING TO

FRAMING

Figure 9

FIREBOX INSTALLATION INSTRUCTIONS (continued)

INSTALLING HOOD

Содержание VFD32FB0F-1

Страница 1: ...Refer to this manual For assistance or additional in formation consult a qualified installer service agency or the gas supplier Carefully review the instructions supplied with the decora tive type unvented room heater for the minimum fireplace size requirement DO NOT INSTALL A VENT FREE LOG SET IN THIS FIREBOX UNLESS THIS FIREBOX MEETS THE MINIMUM DIMENSIONS REQUIRED FOR THE INSTALLATION GAS FIRED A...

Страница 2: ...ns 4 7 Installing Hood 7 8 Gas Line Connection 8 Optional Fresh Air Kit Installation Instructions 9 11 Optional Single Speed Blower Installations Instructions 12 14 Junction Box Wiring Installation Instructions 15 Maintenance 15 Parts List 16 17 How to Order Repair Parts 17 Parts View 18 Accessories 19 20 TABLE OF CONTENTS ...

Страница 3: ...al of such component part or accessory Any such action may create a possible fire hazard Consult your local building codes Firebox Screen The firebox screen must be in place when the firebox is operating Instructions to Installer 1 Installer must leave instruction manual with owner after installation 2 Installer must have owner fill out and mail warranty card supplied with firebox 3 Installer should sh...

Страница 4: ... of the firebox is 2 Leave at least 36 clearance from the front of the firebox Any vent free Gas Log Heater must be For use with approved ANSI Z21 11 2 unvented room heater Follow and complete the installation instructions of the gas log set and the requirements of this firebox Check all fittings for leaks before lighting the gas log set In planning the installation for the firebox it is necessary to d...

Страница 5: ...ed on any of these surfaces 1 A flat hard combustible or non combustible surface 2 A raised platform of combustible or non combustible material 3 Recessed into the floor as illustrated by Figure 4 flush face and Figure 5 louvered models 4 Supported under all 4 corners of the firebox so that contact is made on all four perimeter edges on the bottom of the unit Example Four 4 concrete masonry blocks If ...

Страница 6: ... 5 8 37 5 8 B 34 1 2 39 1 2 43 1 2 34 1 2 39 1 2 43 1 2 C 17 7 16 19 13 16 19 13 16 17 7 16 19 13 16 19 13 16 D 29 33 37 29 33 37 E 33 35 35 33 35 35 F 31 36 40 31 36 40 G 22 3 8 24 3 8 24 3 8 22 3 8 24 3 8 24 3 8 H 1 1 4 1 1 4 1 1 4 6 1 8 6 1 8 6 1 8 I 31 1 2 33 1 2 33 1 2 28 9 16 30 9 16 30 9 16 J 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 8 3 8 K 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 L 31 13 16 36 3 16 38 3 1...

Страница 7: ...s are desired they can be purchased as an option Attachment is the same as the standard black hood Flush Face Models 1 On flush face models loosen the two screws A holding firebox top to face panel then slide the hood flange between the firebox top and face panel and re tighten the screws 2 Install one 1 screw at each end of the hood as shown C Louvered Models 1 If you have a louvered model remove upp...

Страница 8: ...ating plate If the gas listed on the plate is not your type of gas supply DO NOT INSTALL Contact your dealer for proper model Always use an external regulator for all LP fireboxes to reduce the supply tank pressure to a maximum of 14 w c This is in addition to the regulator fitted to the log set WARNING CONNECTION DIRECTLY TO AN UNREGULATED L P TANK CAN CAUSE EXPLOSION Install only a ANSI Z21 11 2 v...

Страница 9: ...roduce outside air to the fireplace or firebox as desired It must be installed prior to or at the time of fireplace or firebox installation to framing The FreshAir kit must be installed prior to the installation of wall board or other finishing materials around the unit Tools needed Gloves Metal snips Vise Grip Nut Driver Standard Screwdriver Caution Sharp edges Air Door Installation for Vent Free Fire...

Страница 10: ...BLY OUTER CASING FRESH AIR ROD OUTSIDE AIR ROD BRACKET Figure 20 OUTSIDE AIR ROD BRACKET OPEN FRESH AIR ROD CONTROL LEVER LEFT SIDE VIEW OF FIREBOX OPENING TOP CUTAWAY VIEW DAMPER ASSEMBLY OUTER CASING FRESH AIR ROD OUTSIDE AIR ROD BRACKET when rotated upward and can be locked open by pulling for ward into the notch at the top of the control lever bracket 10 To close simply disengage by letting th...

Страница 11: ...lamps or screws 3 Run the other end of the duct through the exterior wall cut out 4 From the outside of the building connect the duct to the collar on the outside air vent assembly with band clamp or screws to secure 5 Mate the outside rain cap hood over the air vent seal with caulk as necessary then secure with screws provided to the exterior wall surface See Figure 22 and 23 6 Figure 24 illustra...

Страница 12: ...ion of the FBB5 Blower assembly It is recommended that installation of the wiring be performed by a qualified electrician See Figure 25 1 If installed turn OFF gas supply to firebox gas log 2 If applicable turn OFF electric supply to firebox CAUTION ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL LOCAL CITY AND STATE BUILDING CODES BEFORE MAKING THE ELECTRI CA...

Страница 13: ...al Attach this terminal to the open terminal on the blower power cord See Figure 32 Connection B 10 Route the wires away from moving parts of the blower as sembly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the junction box receptacle at the right rear corner of the firebox outer wrap See Figure 30 12...

Страница 14: ... a dirty blower wheel Remove fan and clean blower wheels Warning Unplugging of blower accessory will not stop the heater from cycling To turn off gas to the heater millivolt model push in gas control knob slightly and turn clockwise to OFF Do not force To turn off gas on direct ignition model turn gas line valve to OFF 1 FBB5 BLOWER ASSEMBLY COMPLETE 2 R8199 FAN CONTROL SWITCH 1 2 A B 110 VOLT AC ...

Страница 15: ...on box Install a ULlisted cable clamp not supplied in the knockout hole Leave approximately 6 of wire in the junction box for connection Attach black wire to one side of the receptacle and white wire to opposite side of receptacle The ground wire should be attached to the green neutral screw Install the receptacle into the junction box Attach cover plate Keep the control compartment logs and burne...

Страница 16: ...EN CURTAIN 16 R8727 R8727 R8727 R8727 R8727 R8727 HOLE PLUG 17 19990 19990 19990 19990 19990 19990 BLOWER COVER PLATE ITEM PART NUMBER DESCRIPTION VFD36FB0L VFD36FB2ML VFD36FB2CL VFD36FB0F VFD36FB2MF VFD36FB2CF 1 17247 17247 17247 17247 17247 17247 TOP STANDOFF 2 18807 18807 18807 N A N A N A UPPER LOUVER 3 10554 10554 10554 10554 10554 10554 FRAMING BRACKET 4 18808 18808 18808 N A N A N A LOWER L...

Страница 17: ...ll causes beyond our control HOW TO ORDER REPAIR PARTS ITEM PART NUMBER DESCRIPTION VFD42FB0L VFD42FB2ML VFD42FB2CL VFD42FB0F VFD42FB2MF VFD42FB2CF 1 17247 17247 17247 17247 17247 17247 TOP STANDOFF 2 17187 17187 17187 N A N A N A UPPER LOUVER 3 10554 10554 10554 10554 10554 10554 FRAMING BRACKET 4 17188 17188 17188 N A N A N A LOWER LOUVER 5 17162 17162 17162 17162 17162 17162 JUNCTION BOX ASSEMB...

Страница 18: ...22992 0 1106 Page 18 PARTS VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 16 17 17 ...

Страница 19: ...x VBP32SA VBP36SA VBP42SA Fresh Air Kit 1 2 8 4 7 6 5 3 Deluxe and Premium Fireboxes BVA 1 Frame Kits Standard 3 Piece Frame Kits Brass Stainless Steel or Hammered Pewter Extruded Aluminum Frame Kits Brass Stainless Steel or Hammered Pewter Contact dealer for all available optional frame kits Standard Hood Brass hood BR Stainless Steel SS Hammered Pewter HP Contact dealer for all available optiona...

Страница 20: ...om Trim Strip Available as optional kits in Brass Hammered Pewter and Stainless Steel finishes Contact dealer for all available optional trim accessories Decorative Door Kits Available as optional kits in Brass Hammered Pewter and Stainless Steel finishes Contact dealer for all available optional frame kit accessories Decorative Frame Kits Available as optional kits in Brass Hammered Pewter and Stai...

Отзывы: