![White Knight PPMC300 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/white-knight/ppmc300/ppmc300_owners-manual_976073017.webp)
Manual Version 1.0.7 15
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
Copyright © 2022 White Knight Fluid Handling | A Graco company
6.5 Decontamination Instructions & Certificate of Decontamination
Attention:
White Knight products are designed for use with caustic and otherwise dangerous liquids. Therefore,
every product must be handled as if it contains dangerous chemicals. White Knight specifies that if a pump
runs under its own power, the pump should circulate DI water for twenty minutes before disassembly or
double-bagging for shipment. If the pump does not run under its own power, then DI water should be forced
from the inlet, through the outlet for 40 minutes before disassembly or double-bagging for shipment. Only
those who have been adequately trained in safety with the handling of acids and other dangerous chemicals
should attempt to handle a White Knight pump that has been exposed to dangerous chemicals. Adequate
safety gear appropriate for the chemical that has been in the pump must be used and no attempt should be
made to handle the pump until MSDS for the chemical that the pump has been used in have been reviewed.
Ph papers, showers, antidotes, clean-up equipment, neutralizers, and any other safety devices that could be
used for detecting, neutralizing or minimizing effects from the chemical described in the appropriate MSDS
must be present along with emergency numbers for use in the event of an accident. Take care in the
handling of liquids and/or residues contained in these pumps or any other chemical handling equipment.
Remember,
Safety First.
Note:
Any pumps returned to White Knight for warranty evaluation or repair must be complete with all
parts and components including but not limited to tubing connectors, tubing connector caps, flare
noses and tubing. Any missing parts will be added to the pump and charged to the customer in the
event of repair or replacement, warranty or otherwise.
Return Material Authorization requests may be filed online here:
https://wkfluidhandling.com/support/rma/
Removal of Pump from Station:
1. Disconnect air supply from the pump.
2. Disconnect liquid lines.
3. Plug liquid fittings per manufactures instructions or plug the pump inlet/outlet ports with a
White Knight buttress plug.
4. Remove the pump from its base plate.
5. Return all removed parts with the pump.
Содержание PPMC300
Страница 18: ...Manual Version 1 0 7 Manual Part Number 18200 LM 0066 ...
Страница 19: ...Manual Version 1 0 7 ...
Страница 20: ...Manual Version 1 0 ...