SEQUENCE OF OPERATION

Cooling System

The cooling system is a complete factory package utilizing an air-
cooled condenser. The compressor is hermetically-sealed and 
base-mounted with rubber-insulated hold-down bolts.

Furnace compressors have internal protection. In the event there 
is an abnormal rise in the temperature of the compressor, the 
protector will open and cause the compressor to stop.

Cooling Sequence of Operation

When the thermostat calls for cooling, R is closed to G and Y. 
See the wiring connection diagrams in “Troubleshooting.” This 
action completes the low voltage control circuit, energizing the 
compressor, condenser fan motor and blower motor.

Blower Delay—Cooling

The circulating air blower is controlled by a timing circuit in the 
integrated blower/ignition control. Timings are not adjustable. 
Blower “on” delay is 5 seconds after the compressor starts and 
blower “off” timing is 90 seconds after the cooling system shuts 
down.

System Performance

For maximum performance of the cooling system, operating 
temperatures and pressure should be checked. Superheat 
should be determined at Standard ARI test conditions of 82ºF 
(27.8ºC) outdoor and 80ºF (26.7ºC) indoor dry bulb/67ºF (19.4ºC) 
wet bulb. If superheat measured deviates from values found in 
the Suction Superheat table, refrigerant charge should be 
adjusted accordingly for maximum performance.

Heating System

With the proper thermostat and subbase, continuous blower 
operation is possible by closing the R to G circuit. Cooling blower 
delay is also functional in this mode.

Heating Sequence of operation

1. When the thermostat calls for heat, the combustion blower is 

energized by the ignition control.

2. When the speed of the combustion blower reaches proper 

RPM, the pressure switch closes, initiating the pre-purge 
timing (30 seconds nominal).

3. When pre-purge has expired, the ignition control energizes 

the gas control valve, the spark electrode and the flame 
sensor. The igniter sparks for 10 seconds, and the flame 
sensor senses that flame has been established. If the flame 
sensor does not sense that flame has been established in the 
10-second interval, the ignition control will de-energize the 
gas control valve.

4. The ignition control is designed to repeat this “trial for 

ignition” a total of three times. If, at the end of the third trial, a 
flame still has not been established, the ignition control will 
repeat the trial for ignition sequence 1 hour later. The 1-hour 
retry is indefinite. 

5. Thirty seconds (nominal) after the initial trial for ignition, the 

circulation air blower will start.

6. When the thermostat is satisfied, the combustion blower and 

gas control valve are de-energized. The circulating air blower 
motor will continue to run for a short period after the 
thermostat is satisfied.

Circulating Air Blower

Depending on the package unit model, the blower motor will be 
either a multi-speed or variable-speed motor.

Multi-Speed Motor

The circulating air blower is controlled by a timing circuit in the 
integrated blower/ignition control. Timings are not adjustable.

Cooling

Blower “on” delay is 30 seconds after call for cooling. Blower 
“off” delay is 90 seconds after the cooling system shuts down.

Heating

Blower “on” delay is 30 seconds (nominal) after burner ignition. 
Blower “off” delay is approximately 120 seconds after the 
thermostat is satisfied.

Suction Superheat

Series

Size

Suction Superheat 
@ ARI Conditions 
82ºF (27.8ºC) OD / 
80ºF (26.7ºC) IDDB/
67ºF (19.4ºC) IDWB

PGE/SG13

24

22º

30, 36, 42, 48, 60

20º

PGEX/SGX15

24, 30

15º

36, 42

12º

48, 60

10º

Содержание W2PG

Страница 1: ...11 Adjust Blower Speed Variable Speed Motor Only 12 Measure Temperature Rise 13 Shut Down 13 SEQUENCE OF OPERATION 14 Cooling System 14 Heating System 14 Circulating Air Blower 14 Controls 15 TROUBLESHOOTING 15 ASSISTANCE OR SERVICE 19 Accessories 19 You can be killed or seriously injured if you don t immediately You can be killed or seriously injured if you don t follow All safety messages will t...

Страница 2: ...n and position as specified in the Location Requirements section of these instructions Never test for gas leaks with an open flame Use a commercially available soap solution made specifically for the detection of leaks to check all connections as specified in the Make Gas Connections section of these instructions Always install furnace to operate within the furnace s intended temperature rise rang...

Страница 3: ...eezing and snowfall the furnace should be elevated above the average snow line If the furnace is to be installed on a flat roof it should be on a platform or other support which will raise the base a minimum of 8 above the surface of the flat roof This furnace can be installed on combustible Class A Class B or Class C roof covering material Avoid placing a furnace near areas such as sleeping quart...

Страница 4: ...nt protection minimum service ampacity and operating voltage See the wiring connection diagrams in Troubleshooting This furnace must be electrically grounded in accordance with National Electric Code ANSI NFPA 70 requirements applicable requirements of UL or local codes where applicable GasSupplyRequirements This furnace is equipped for use with Natural gas A conversion kit is required for use wit...

Страница 5: ...cess panels must be secured in place before hoisting The furnace should be hoisted with 2 lifting slings Attach the slings to rigging shackles that have been hooked through holes in the lifting brackets Place 2 spreaders on top of the furnace to protect the furnace from damage from the pressure exerted by the slings Make sure that all equipment is rated to handle at least 750 lbs and that the slin...

Страница 6: ...pplications to avoid accumulation of condensate under or around the furnace Install Condensate Trap 1 Construct the condensate trap from PVC tubing as shown in Condensate Trap Construction NOTES The condensate trap allows a standing column of water of at least 2 50 mm The top of the drain trap inlet must be at least least 1 25 mm above the top of the drain trap outlet The trap should be installed ...

Страница 7: ... 99 1 m per min for disposable filters and 525 ft 160 m per min for cleanable filters MakeElectricalConnections IMPORTANT Electrical wiring disconnect means and over current protection are to be supplied by the installer Refer to the rating plate for the maximum over current protection minimum circuit ampacity and operating voltage See the wiring connection diagrams in Troubleshooting Install an a...

Страница 8: ...e and Low Voltage Connections 1 Route the low voltage supply wires through the low voltage entry opening to the low voltage connection area providing sufficient length to connect to the low voltage pigtail leads 2 Using UL listed wire nuts connect the low voltage supply wires to the matching colors of the low voltage leads 3 Replace the burner access panel 4 Replace the blower access panel WARNING...

Страница 9: ...close to the controls as possible to facilitate removal of controls and manifold Pipe joint compounds suitable for use with Natural and LP gas must be used Do not use Teflon tape Side entry is the usual method of routing the gas supply to the unit Use the factory provided grommet to seal the opening around the gas pipe preventing rain and moisture from entering the unit around the gas pipe and red...

Страница 10: ...At altitudes above 4 500 ft the furnace input rate must not exceed that on the furnace rating plate reduced by 4 percent for each 1 000 ft above sea level 1 For Natural gas check the furnace rate by observing the gas meter making sure all other gas appliances are turned off The test hand on the meter should be timed for at least one revolution 2 The actual heating value of your gas can be obtained...

Страница 11: ...n Be sure the exhaust vent is not blocked AdjustBlowerSpeedMulti SpeedMotorOnly You can choose the same speed or different speeds for COOL or HEAT NOTE See the wiring connection diagrams in Troubleshooting 1 If the temperature rise is too high change the speed tap to one step higher 2 If the temperature rise is too low change the speed tap to one step lower Blower Speed Tap Change Manifold Pressur...

Страница 12: ...flow changes can be made by moving the position of the HEAT and COOL taps See Adjusting Airflow for Variable Speed Motor chart Continuous Blower The comfort level of the living space can be enhanced when using this feature by allowing continuous circulation of air between calls for cooling or heating The continuous circulation of air occurs at half the full cooling airflow rate To use this feature...

Страница 13: ...er access panel 4 Turn off the gas supply at the manual gas shutoff valve 5 Replace the burner access panel Gas Control Valve Adjusting Airflow for Variable Speed Motor Model Motor HP ADJUST Setting HEAT Setting Cooling CFM 50 Static Nominal Cooling kBTU Heating Input kBTU COOL Setting A COOL Setting B COOL Setting C COOL Setting D 24 30 68 NORM A 1 000 800 600 900 36 68 NORM B 1 200 1 000 800 1 1...

Страница 14: ...ition control 2 When the speed of the combustion blower reaches proper RPM the pressure switch closes initiating the pre purge timing 30 seconds nominal 3 When pre purge has expired the ignition control energizes the gas control valve the spark electrode and the flame sensor The igniter sparks for 10 seconds and the flame sensor senses that flame has been established If the flame sensor does not s...

Страница 15: ...trol to close the gas control valve To reset push the button on top of the switch Auxiliary Limit 42 48 and 60 units only This control is located in the side of the circulation air blower housing The switch causes the ignition control to close the gas control valve should the circulation blower fail to operate This control resets automatically TROUBLESHOOTING Furnace Fails to Operate Properly Revi...

Страница 16: ... Dual Capacitor Compressor Transformer C S R L1 CMB BLWR Spark Comb Air Blower Ignition Control BK W L2 L1 BK BR PR R R BK 208V 240V 24V Indoor Blower Motor BK S4 S1 K1 A3 GV1 S21 S18 S47 S10 T1 B3 B6 B4 K1 2 C12 B1 K1 1 A3 Ground BU Y LED Y E1 C4 Capacitor H M L C ACB Cool ACB Heat BK BU Jumper installed on some models See Blower Speed Chart For Wiring 208 230V 1 60 Wiring Connection Diagram Sing...

Страница 17: ...BK BR PR R R BK 208V 240V 24V Indoor Blower Motor 5 4 3 See Blower Speed Chart BK S4 S1 K1 A3 GV1 S21 S18 S47 S10 T1 B3 B6 B4 K1 2 C12 B1 K1 1 A3 A54 B3 Ground BU Y A132 ADJUST HEAT COOL NORM TEST A B C D A B C D DIAGNOSTICS The following ignition control board LED codes will indicate normal or abnormal operations SLOW FLASH Normal operation no call for heat FAST FLASH Normal operation call for he...

Страница 18: ...18 Typical Low Voltage Connections R R C C Y Y W THERMOSTAT OUTDOOR UNIT G G WITH ECONOMIZER C R R Y1 Y1 THERMOSTAT OUTDOOR UNIT ECONOMIZER Y W G G G Y2 BK C BU G Y2 W W OR Not Used WITHOUT ECONOMIZER ...

Страница 19: ...nclude a daytime phone number in your correspondence Accessories To order accessories ask for the appropriate part number listed below or contact your Whirlpool Home Cooling and Heating dealer Part Number Accessory Model s 48193 004 ALPKT804 1 LP Conversion Kit W2PG324A068 through W2PG336A090 48193 005 ALPKT805 1 LP Conversion Kit W2PG342A083 through W2PG360B110 48193 001 ALIFT801 1 Lifting Bracke...

Страница 20: ... Honeywell and SmartValve are trademarks of Honeywell International Inc Registered Trademark TM Trademark of Whirlpool U S A Manufactured under license by Tradewinds Distributing Company LLC Coconut Grove Florida 11 05 Printed in U S A ...

Отзывы: