background image

6.

Move dryer close to final

position. Remove cardboard or
hardboard from under dryer.

8.

Connect gas supply to dryer.

Use pipe-joint compound resistant to
the action of L.P. gas for gas
connections. If flexible metal tubing is
used, be certain there are no kinks. 

If necessary for service, open the toe
panel, use a putty knife to press on
the toe panel lock located at the
center top of the toe panel. Pull
downward on the toe panel to open.
Toe panel is hinged at the bottom.

Note: Dryer door must be closed for
dryer to operate. When door is open,
dryer stops, but timer continues to run.
To restart dryer, close door and push
START/RESTART button.

7.

Remove red cap from gas pipe.

Carefully move dryer into final
position. Place level on top of the
dryer, first side to side; then front to
back. If the dryer is not level, adjust
the legs of the dryer up or down until
the dryer is level.

4.

Start to screw the leveling legs

into the holes by hand. (Use a small
amount of liquid detergent to
lubricate the screw threads so it is
easier to turn the legs.) Use a 1-inch
wrench or socket wrench to finish
turning the legs until you reach the
diamond mark.

Now stand the dryer up.

Slide dryer onto cardboard or
hardboard before moving across floor
to avoid damaging floor covering.

5.

Remove the service door of the

meter case. Lift
the service door
up at the back
and remove.
Install money-
accepting
device. (Refer to
manufaturer's
instructions for proper installation.)

For dryers using coin slides, use
adapter kit supplied with dryer.

Replace the meter case service door.
Put the coin vault with lock and key
the meter case opening.

11.

To exhaust dryer, see Exhaust

requirements, Pages 3-4. Connect
exhaust vent system to dryer exhaust
outlet and exhaust hood using 4"
(10.2 cm) clamps. Use caulking to
seal exterior wall opening around
exhaust hood.

12.

Carefully move dryer into

final position. Place level on top of
the dryer, first side to side; then front
to back. If the dryer is not level, adjust
the legs of the dryer up or down until
the dryer is level.

13.

Plug power supply cord into

grounded outlet.

14.

Check dryer operation (some

accumulated time may be on the
timer due to factory testing). 

Insert coins in slide and press slide in
slowly. (Operating time will
accumulate per number of coins and
type of timing cam used.) Push
START/RESTART button. Using a full
heat cycle (not the air cycle), let the
dryer run for at least five minutes.
Dryer will stop when time is used up.

10.

Use a non-corrosive leak

detection fluid to check for leaks.
Bubbles around connections will
indicate a leak. 

NEVER TEST FOR GAS

LEAKS WITH A FLAME.

If a leak

appears, shut off gas valve controls
and adjust connections. Then check
connections again. Close toe panel.

All connections must be wrench-
tightened.

Now Start...

Page 6

15.

If the burner does not ignite

and you can feel no heat inside the
dryer, 

shut off dryer for five minutes.

Check that all supply valve controls
are in "ON" position and that the
electrical cord is plugged in. Repeat
five-minute test.

16.

If drying time is too long,

make sure lint screen is clean.

3-prong, 
ground-type
outlet 

gas supply line

gas shutoff valve

exhaust duct

With dryer in laundry area.

1.

Take tape off front corners of

dryer. Open dryer and remove the
literature and parts packages. Wipe
the interior of the drum thoroughly
with a damp cloth. 

2.

Take two of the cardboard

corners from the carton and place
them on the floor in back of the dryer.
Firmly grasp the body of the dryer
and gently lay it on its back on the
cardboard corners.

3.

With one of the legs in hand,

check the ridges for a diamond
marking. That's how far the leg is
supposed to go into the hole.

9.

Open the shutoff valve in the

gas supply line. 

Excessive Weight Hazard

Use two or more people to move and
install dryer.
Failure to do so can result in back or
other injury.

WARNING

Содержание 8316558

Страница 1: ...nstallation Instructions with the owner Owner Keep Installation Instructions for future reference Save Installation Instructions for local electrical inspector s use COMMERCIAL DRYER GAS Part No 8316558 Rev A COMMERCIAL LAUNDRY PRODUCTS www whirlpool com 120 volt 60 Hz ELECTRIC 120 240 volt 60 Hz ...

Страница 2: ...installed in an area where it will be exposed to water and or weather It is your responsibility to If installing a GAS dryer FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliances IMPORTANT SAFETY INSTRUCTIONS WARNING To reduce the risk of fire electric shock or injury to persons when using your appliance follow basic prec...

Страница 3: ...hat V shaped notch clears the ratchet tooth 7 Close and lock the meter case Exhaust requirements Do not use non metal flexible vent metal vent that is smaller than four inches in diameter or exhaust hoods with magnetic latches The dryer must be exhausted outdoors Do not exhaust dryer into a gas vent chimney wall ceiling or concealed space of a building Do not install flexible vent in enclosed wall...

Страница 4: ...st system is required A main exhaust vent can be used for exhausting a group of dryers Main exhaust vent should be sized to remove 200 CFM of air per dryer Large capacity lint screens of proper design may be used in the main exhaust vent if checked and cleaned frequently The room where the dryers are located should have make up air equal to or greater than the CFM of all the dryers in the room Bac...

Страница 5: ...se F The supply line shall be equipped with a shutoff valve installed within 6 ft 1 8 m of dryer in accordance with the National Fuel Gas Code ANSI Z223 1 latest edition In Canada an individual manual shutoff valve must be installed in accordance with the B149 installation codes CAN CGA B149 1 and CAN CGA B149 2 This valve should be located in the same room as the dryer and should be in a location...

Страница 6: ...aust hood 12 Carefully move dryer into final position Place level on top of the dryer first side to side then front to back If the dryer is not level adjust the legs of the dryer up or down until the dryer is level 13 Plug power supply cord into grounded outlet 14 Check dryer operation some accumulated time may be on the timer due to factory testing Insert coins in slide and press slide in slowly ...

Страница 7: ...a separate ground wire is used it is recommended that a qualified electrician determine that the ground path is adequate Important Observe all governing codes and ordinances A four wire or three wire Canada four wire only single phase 120 240 volt 60 Hz AC only electrical supply or four wire or three wire 120 208 volt if specified on the model serial rating plate is required on a separate 30 amper...

Страница 8: ...r type of connection Four wire recommended method Three wire if four wire is not available 1 Disconnect the power supply 2 Remove hold down screw and terminal block cover Power supply cord U S only Direct wire U S only This dryer is manufactured with the cabinet ground conductor connected to the NEUTRAL center of the wiring harness at the terminal block If local codes do NOT permit this type of co...

Страница 9: ... other wires to outer terminal block screws Tighten screws 6 Connect the ground wire bare of the power supply cable to the external ground conductor screw Tighten screw 9 Tighten strain relief screws 10 Insert tab of terminal block cover into slot of dryer rear panel Secure cover with hold down screw 9 Tighten strain relief screws 10 Insert tab of terminal block cover into slot of the dryer rear p...

Страница 10: ...al wire 4 Loosen or remove center terminal block screw 7 Tighten strain relief screws 8 Insert tab of terminal block cover into slot of dryer rear panel Secure cover with hold down screw 6 Place the hooked ends of the other power supply cable wires under the outer terminal block screws hook facing right Squeeze hooked ends together Tighten screws 5 Place the hooked end of the neutral wire white or...

Страница 11: ...nded that a qualified electrician determine that the ground path is adequate 8 To exhaust dryer see Exhaust requirements Pages 3 4 Connect exhaust vent to dryer exhaust outlet and exhaust hood using 4 10 2 cm clamps Use caulking to seal exterior wall opening around exhaust hood 9 Carefully move dryer into final position Place level on top of the dryer first side to side then front to back If the d...

Страница 12: ... Recessed front view Closet side view Closet front view 3 7 6 cm 48 sq 24 sq The dryer must be exhausted outdoors No other fuel burning appliance may be installed in the same closet Minimum Installation Clearances 14 35 6 cm max 1 2 5 cm This dryer may be installed in a recessed area or closet For recessed area and closet installations minimum clearances can be found on the serial tag on the dryer...

Страница 13: ... 18 3 8 46 7 cm 4 10 2 cm dia 1 2 5 cm non coin operated models 7 1 8 18 1 cm coin operated models 7 7 8 20 cm SIDE VIEW 35 88 9 cm 25 1 2 64 8 cm 27 68 6 cm 37 94 cm 14 35 6 cm ELECTRIC GAS EXHAUST LEFT OR RIGHT SIDE EXHAUST 4 3 4 12 1 cm 13 33 cm 1 1 4 3 2 cm BACK VIEW 4 1 4 10 8 cm 6 3 4 15 2 cm 4 10 2 cm dia 1 2 5 cm non coin operated models 7 1 8 18 1 cm coin operated models 7 7 8 20 cm SIDE ...

Страница 14: ...taire Propriétaire Conserver les instructions d installation pour consultation ultérieure Conserver les instructions d installation pour consultation par l inspecteur local des installations électriques SÉCHEUSE COMMERCIALE GAZ Pièce n 8316558 Rév A APPAREILS DE BUANDERIE COMMERCIALE www whirlpool com 120 volts 60 Hz ÉLECTRIQUE 120 240 volts 60 Hz ...

Страница 15: ...t aucun risque d exposition aux substances dangereuses générées par la combustion des gaz Remarque La sécheuse ne doit pas être installée en un endroit où elle serait exposée à de l eau ou aux intempéries C est au propriétaire de l appareil qu incombe la responsabilité de Pour l installation d une sécheuse à GAZ INSTRUCTIONS DE SÉCURITÉ IMPORTANTES Avertissement Pour réduire le risque d incendie c...

Страница 16: ...duit métallique de diamètre inférieur à 10 2 cm 4 po ou une bouche de décharge avec clapet à fermeture magnétique L orifice d évacuation de la sécheuse doit être relié à l extérieur Ne pas connecter le circuit d évacuation à une cheminée au conduit d évacuation d un appareil à gaz ou à grenier ou vide sanitaire ou à une cavité fermée dissimulée du bâtiment plafond mur etc Ne pas installer un condu...

Страница 17: ...nt pour évacuer 94 4 litres sec 200 pi3 m d air par sécheuse Des filtres à charpie de forte capacité et de conception adéquate peuvent être utilisés dans le conduit collectif d évacuation s ils sont inspectés et nettoyés fréquemment La pièce où se trouvent les sécheuses devrait recevoir un apport d air de débit égal ou supérieur au débit total pi3 s de toutes les sécheuses installées dans la pièce...

Страница 18: ...se conformément aux prescriptions de la dernière édition de la norme ANSI Z223 1 National Fuel Gas Code Au Canada un robinet d arrêt manuel individuel doit être installé conformément aux prescriptions des normes CAN CGA B149 1 et B149 2 codes d installation Ce robinet doit être situé dans la même pièce que la sécheuse à un endroit où on peut facilement l ouvrir et le fermer Ne pas entraver l accès...

Страница 19: ...rmé Si c est nécessaire enlever le panneau de plinthe utiliser un couteau à mastic pour appuyer sur le verrou situé au centre au sommet du panneau de plinthe Tirer vers le bas pour provoquer l ouverture du panneau de plinthe Le panneau de plinthe est monté sur des charnières en bas 9 Ouvrir le robinet d arrêt de la canalisation d arrivée de gaz 10 Utiliser un liquide non corrosif de détection des ...

Страница 20: ...és ou de disjoncteurs Méthode recommandée de liaison à la terre Aux É U C est au client qu incombent l obligation et la responsabilité personnelle de contacter un électricien qualifié qui devra vérifier que l installation électrique est adéquate et conforme aux prescriptions du Code national de l électricité ANSI NFPA 70 dernière édition et de tous les codes et règlements locaux Au Canada C est au...

Страница 21: ...accordé par un cordon d alimentation INSTRUCTIONS DE LIAISON À LA TERRE Cet appareil doit être relié à la terre Advenant un fonctionnement défectueux ou une panne la liaison à la terre réduira le risque de choc électrique en fournissant une voie de passage de moindre résistance pour le courant électrique Le cordon d alimentation doit être branché dans une prise de courant murale de configuration c...

Страница 22: ...e du panneau arrière de la sécheuse Immobiliser le couvercle avec la vis de retenue 4 Ôter la vis de la borne centrale du bloc 5 Séparer le conducteur de liaison à la terre de l appareil vert avec rayure jaune de la vis de connexion au châssis Connecter ce conducteur sous la vis centrale de teinte argent du bloc de connexion 6 Connecter le conducteur vert de liaison à la terre du cordon d alimenta...

Страница 23: ...mentation sous la vis de la borne centrale crochet orienté vers la droite Serrer le crochet sur la vis puis serrer la vis 6 Placer l extrémité en crochet des autres conducteurs d alimentation sous les vis des bornes du bloc de connexion crochet orienté vers la droite Serrer le crochet sur la vis puis serrer la vis 7 Serrer les vis du serre câble 8 Insérer l onglet du couvercle du bloc de connexion...

Страница 24: ...charge extérieure 9 Placer prudemment la sécheuse à son emplacement final Placer un niveau sur le sommet de la sécheuse transversalement puis dans le sens avant arrière Si la sécheuse n est pas d aplomb ajuster les pieds pour modifier la hauteur et établir un bon aplomb de la sécheuse 10 Aux États Unis et au Canada brancher le cordon d alimentation électrique sur une prise de courant reliée à la t...

Страница 25: ...en pouces il s agit des distances minimales Il est utile de prévoir des distances de séparation supérieures pour faciliter l installation et les travaux d entretien ou si ceci est exigé par les codes et règlements locaux Si la porte du placard est installée on doit respecter la taille minimale des ouvertures d entrée d air au sommet et en bas On peut utiliser une porte à jalousies offrant une surf...

Страница 26: ...4 cm 37 po 35 6 cm 14 po BOUCHE DE DÉCHARGE CÔTÉ GAUCHE OU CÔTÉ DROIT 12 1 cm 4 3 4 po 33 cm 13 po 3 2 cm 1 1 4 po 10 8 cm 4 1 4 po 15 2 cm 6 3 4 po 10 2 cm 4 po dia 2 5 cm 1 po Modèle sans mécanisme de commande à pièces 18 1 cm 7 1 8 po Modèles avec mécanisme de commande à pièces 20 cm 7 7 8 po Modèle sans mécanisme de commande à pièces 18 1 cm 7 1 8 po Modèles avec mécanisme de commande à pièces...

Отзывы: