Whelen Engineering Company 1010 Скачать руководство пользователя страница 2

Page 2

BOTTOM VIEW OF BASE

Drill Wire Hole Here (If Necessary)

Drill Mounting

Holes Here

Wire

Channel

The  Whelen  1000  Series  Strobe  Light  Beacons  have  a
universal mounting  base. An optional magnetic  mount kit may
be added for those requiring a temporary warning beacon.

WARNING: The use of any magnetically mounted warning
beacon on the outside of a vehicle while in motion is not
recommended and is at the sole discretion and risk of the
user  This  strobe  light  was  designed  to  be  mounted  in  a
normal  “dome  up”  position.  If  mounted  in  an  inverted
position, drill a 1/8 inch diameter hole in the lowest point of
the dome to let condensation drain.

3/8 Inch Pipe Mount:

1.

Feed the power wires through the pipe.

2.

Connect  the  power  wires  to  the  wires  from  the  light  (see

Wiring Instructions” 

next page).

3.

Screw the strobe beacon onto the pipe, being careful not to
pinch or strain the wires. 

Hand tighten

 unit onto pipe.

Permanent Surface Mount:

1.

Using the base of the strobe light as a template, mark the
location  of  the  mounting  holes  and  the  wire  access  hole.
The  wire  access  hole  may  be  located  either  beneath  the
center of the base, or the wire may be routed through the
wire channel located underneath the strobe light base for
surface wiring. 

2.

Drill  the  starter  holes  for  the  three  sheet  metal  mounting
screws with a 7/64 inch drill. Drill the wire access hole large
enough  for  the  wires  to  fit  through.  Deburr  all  holes  and
install a rubber grommet (customer supplied) to protect the
wires.

3.

Feed the power wires through the wire access hole in the
base, and through the mounting gasket.

4.

Connect the power wires to the wires from the strobe light.
See “

Wiring Instructions” 

next page.

5.

Push the excess wires back through the wire access hole
while aligning the mounting holes in the strobe light base,
mounting gasket, and the mounting surface.

6.

Secure  the  strobe  light  head  assembly  to  the  mounting
surface with the three sheet metal screws provided.

Tamper Resistant Mount:

NOTE:

 It will be necessary to disassemble the strobe light head

assembly in order to use this mounting style.

WARNING!  The  strobe  light  is  a  high  voltage  device.  DO
NOT TOUCH the strobe lamp assembly or the strobe power
supply  assembly  while  the  unit  is  in  operation!  WAIT  10
MINUTES after turning power off before starting any work
or troubleshooting.

NOTE: 

As you remove the power supply assembly, take note

(for re-assembly) that the capacitor sits in a cradle within the

Fig. 1

Tamper Resistant

Mounting

1.

Using  a  small  straight  blade  screwdriver,  pry  the  dome
upward  at  the  three  pockets  in  the  base,  and  remove  the
polycarbonate optic dome taking precautions not to damage
or  lose  the  dome  gasket.  Remove  the  strobe  power  supply
assembly from the base. 

2.

Using  a  3/16  inch  drill,  drill  through  the  three  flashed  over
mounting holes located around the inside of the base. 

3.

Using  the  base  as  a  template,  mark  the  location  of  the
mounting  holes  and  wire  access  hole  onto  the  mounting
surface.

4.

Drill the starter holes for the three mounting screws with a 7/
64 inch drill. Drill the wire access hole large enough for the
wires  to  fit  through.  Deburr  all  holes  and  install  a  rubber
grommet (customer supplied) to protect the wires.

5.

Feed  the  power  wires  through  the  wire  access  hole  in  the
mounting  surface  and  through  the  mounting  gasket  and
strobe light base.

6.

Align  the  mounting  holes  in  the  strobe  base,  gasket,  and
mounting surface. Secure the base to the mounting surface
with the three mounting screws provided.

7.

Inside the base, tie a knot in the power wires 3 inches from
the end to act as a strain relief. Connect the power wires to
the strobe power supply assembly (see “

Wiring Instructions”

next page). Replace the strobe power supply assembly into
the base being careful not to pinch any of the wires.

8.

Replace the dome gasket on the power supply assembly and
secure the optic dome to the base by aligning the tabs on the
dome with the pockets in the strobe base. Press firmly on the
top of the optic dome so the tabs snap into the pockets.

Отзывы: