Please call for replacement parts or assistance:
1-866-942-5362
Whalen Storage
Factory No. 14400
Page # 6
Assembly Instructions
7.
Insert deck support channel (part D) into
slots in load beams as shown in detail #4.
Repeat step 7 to install the remaining
channels to the rack. Make sure all of the
channels are seated completely.
8. Insert wire decks onto shelves assembly
as shown in detail #5.
9. Periodically inspect the unit to ensure beams are seated properly and clips are
firmly connected to the columns.