4. T
RANSPORT
& P
LACEMENT
W
ESTFIELD
- G
RAIN
A
UGERS
4.2. P
LACEMENT
P
ROCEDURE
MK 100/130 P
LUS
X
91’ - 111’
44
30260 R0
4. Raise intake feed hopper into transport
position by attaching cable hook to the
handle on the side of the hopper, then
fully raise hopper with intake side facing
toward main auger. Secure hopper to lift
arm with the hopper lock, saddle pins,
and hairpins provided. See Figure 4.3.
Intake feed side of hopper must face main
auger when in transport, see Figure 4.3.
5. Place
swivel
jack
(on side of hitch) in
transport position and lock.
6. Beware of overhead obstructions and electrical wires and devices. The MK
91’ auger has a minimum clearance of 14'6 (4.42 m) and the 111’ is at 17’2”
(5.25 m).
7. Refer to “Transport & Placement Safety” on page 12 for important safety
information before towing.
4.2. PLACEMENT PROCEDURE
1. PTO driveline must be disconnected from tractor and secure in transport
saddle for placement.
2. Ensure that towing hitch is in place and secure.
NOTICE
Do not operate auger with intake hopper in transport
position. This will damage the u-joint.
CAUTION
If auger wheels are partially or fully buried in
snow or grain, failure to clear the area around
the wheel before moving may cause damage
to the auger or result in serious injury.
Figure 4.3
Important:
WARNING
Auger must be hooked up to tractor for all
operations, including transport, raising,
placement, and augering grain.
Содержание MK130 Plus
Страница 6: ...1 INTRODUCTION WESTFIELD GRAIN AUGERS MK 100 130 PLUS X 91 111 6 30260 R0 ...
Страница 22: ...4 TRANSPORT PLACEMENT WESTFIELD GRAIN AUGERS 4 2 PLACEMENT PROCEDURE MK 100 130 PLUS X 91 111 48 30260 R0 ...
Страница 28: ...5 OPERATION WESTFIELD GRAIN AUGERS 5 3 OPERATING PROCEDURE MK 100 130 PLUS X 91 111 54 30260 R0 ...
Страница 36: ...7 TROUBLESHOOTING WESTFIELD GRAIN AUGERS MK 100 130 PLUS X 91 111 62 30260 R0 ...
Страница 40: ...8 APPENDIX WESTFIELD GRAIN AUGERS 8 3 INTAKE FEED HOPPER HYDRAULICS MK 100 130 PLUS X 91 111 66 30260 R0 ...