background image

 

 

III 

 

Mounting and Using 

1.  Select  a  place  and  mark  the  position  of  saddle  and  handlebars  on 

the  ceiling.  Observe  the  right  distance  to  the  ceiling.  On  a  wooden 
ceiling, find a ceiling joist for firm attachment. 

2.  Mark the positions of the mounting screws on the ceiling and attach 

the lift assemblies with woodscrews on a ceiling joist or screws and 
rawplugs in a concrete ceiling. 

3.  Lead the rope over the pulleys and through the emergency clamp as 

shown in the pictures. The emergency clamp must  be at the pulling 
end  of  the  rope,  so  it  can  clamp  the  rope  into  place  if  it  slips  from 
your hands while lifting or lowering the bike. 

4.  Finally, mount the wall clamp for the rope in a suitable location. 
5.  To  lift  your  bike,  hook  the  hook  assembly  pulleys  into  saddle  and 

handlebars and lift the bike to the desired height. Attach the rope to 
the wall clamp. The maximum load is 20 kg. 

Contents  of  the  Package:  2  Lift  Assemblies,  2  Hook  Assemblies, 
1 Nylon Rope, 1 Wall Clamp, 10 Screws and Rawplugs 

Отзывы: