Lit. No. 31002/31004, Rev. 00
22
June 1, 2022
FINAL ADJUSTMENTS
FINAL CHECKLIST
Verify that the spinner turns freely.
Verify correct conveyor pintle chain tension and
alignment.
Verify that dielectric grease is applied to all
electrical connections.
Verify that wire harnesses and battery cables are
properly secured away from hot, sharp, or moving
parts.
Verify that the vehicle battery cable has sufficient
ground clearance when the spreader is removed
from the vehicle.