background image

 

LIFTING POINT EXAMINATION RECORD CARD 

 

Tank Model: ___________________ 

Tank Capacity: _________________ 

Safe Working Load: _____________kg  

Date of Manufacture: ___________ 

 

Date of 
Inspection 

Name of 
Inspector 

Address of 
Inspector 

Address of 
Premises of 
Examination 

Pass / 
Defected 

Notes 
Ref. 

Next 
Examination 
Date 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notes: 

(e.g. Defects/Action taken + date/To whom reported)

 

 
 
 
 
 
 
 
 
 

Содержание TRANSCUBE GLOBAL 05TCG-EU

Страница 1: ...TRANSCUBE GLOBAL 05TCG EU 10TCG EU 20TCG EU 30TCG EU INTERMEDIATE BULK CONTAINER Instruction Manual W001 014 WL092...

Страница 2: ...o ensure that the information is correct at the time of publication However it is the owners users sole responsibility to ensure that they and the IBC fully comply with all legal requirements Western...

Страница 3: ...e Equipment for the task you are performing Wear gloves when handling this equipment Wear suitable clothing Steel toecap boots must be worn If appropriate wear a hard hat Do not wear loose jewellery o...

Страница 4: ...3 KNOW YOUR IBC...

Страница 5: ...its Stacking of units is permissible up to 2 high when both full or three high where all are empty Where stacking is required the same rules apply as with a standalone unit Do remember to take into co...

Страница 6: ...tag lines to the base of the unit to control rotation LIFT ONLY ONE UNIT AT A TIME Lifting Lift the chains until taut and check that the hooks are correctly positioned with gate closed and that the ch...

Страница 7: ...points must be visually inspected at suitable intervals The intervals and scope of inspection should be determined by a competent person in the users or owners organisation in accordance with the safe...

Страница 8: ...city _________________ Safe Working Load _____________kg Date of Manufacture ___________ Date of Inspection Name of Inspector Address of Inspector Address of Premises of Examination Pass Defected Note...

Страница 9: ...s of a heavy duty steel construction and is fitted with two gas struts to assist in its raising The hatch should be kept closed when the IBC is not being used to protect the fittings and bunded area f...

Страница 10: ...against any spillage exiting the unit and polluting the immediate area The bund is designed to retain up to 110 of the unit s maximum storage capability Though it is of a high capacity any fuel enteri...

Страница 11: ...the main tank is required and for this the tank must be removed from the bund Inner tank removal Before carrying out this procedure make sure that you have the correct tools for the task a set of fou...

Страница 12: ...NTAL RESPONSIBILITY Please refer to Environment Agency doc PPG7 available to download free from http www environment agency gov uk Correct and considerate management of diesel its storage and transfer...

Страница 13: ...authority regulations for their correct disposal MODIFICATIONS If additional equipment or any third party work modifications or alterations are to be carried out on the IBC which will involve any wel...

Страница 14: ...13 05TCG EU SPECIFICATION SHEET...

Страница 15: ...14 05TCG EU GA DRAWING...

Страница 16: ...15 05TCG EU CERTIFICATE OF CONFORMITY...

Страница 17: ...16 10TCG EU SPECIFICATION SHEET...

Страница 18: ...17 10TCG EU GA DRAWING...

Страница 19: ...18 10TCG EU CERTIFICATE OF CONFORMITY...

Страница 20: ...19 20TCG EU SPECIFICATION SHEET...

Страница 21: ...20 20TCG EU GA DRAWING...

Страница 22: ...21 20TCG EU CERTIFICATE OF CONFORMITY...

Страница 23: ...22 30TCG EU SPECIFICATION SHEET...

Страница 24: ...23 30TCG EU GA DRAWING...

Страница 25: ...24 30TCG EU CERTIFICATE OF CONFORMITY...

Страница 26: ...e date of the last inspection and test shall be entered on the plate attached to the TransCube and recorded in a report to be kept by the owner at least until the date of the next test Date Lifting Br...

Страница 27: ...etc is not an acceptable description of problem Whenever possible please supply supporting pictures with the description this will speed the warranty process FULL DETAILS OF ISSUE Return items with a...

Страница 28: ...the Manufacturer or their recognised agents for repair or assessment against a warranty claim on any product or component Materials and or labour costs to renew repair or replace components due to fa...

Страница 29: ...28 NOTES...

Страница 30: ...29 NOTES...

Страница 31: ...30 NOTES...

Страница 32: ...ail sales western global uk com Original English Language Instruction Manual All rights reserved No part of this manual may be reproduced stored in a retrieval system or transmitted in any form or by...

Отзывы: