LEONARDO PRO II 3000/48 Li
User manual
EN
9
MECHANICAL INSTALLATION
The installation of the equipment must be performed by authorized and specialized personnel to perform this task,
after appropriate training for the commissioning of equipment of this type.
The installation must be carried out with the equipment disconnected from the grid(alternating current connections)
and disconnected from the accumulator battery bank (open DC isolator).
1.
Install the
Leonardo PRO II 3000/48 Li
in a dry and adequately ventilated area, fixed on a non-flammable surface
and positioned in such a way as to leave an obstacle-free space of at least 10cm around the device that allows
it to cool down by forced air convection.
2.
Fix the support bracket (supplied) to the wall using the wall plugs and screws supplied; then hook the inverter
through the hook plate located in the upper part of the appliance. Finally fix the inverter to the wall using the
holes provided in the lower part of the appliance. All as indicated in
Pic. 13
.
Pic.13 Wall mounting
HOOK PLATE
upper part of the inverter
SUPPORT
BRACKET
PLATE
lower part of the inverter
Содержание Leonardo Pro II
Страница 1: ...Leonardo Pro II 3000 48 Li Manuale utente User manual IT EN...
Страница 2: ......
Страница 36: ......