21
following includes the dimension of EN50022 DIN rail for your reference.
The Switch should install and used at Restriced Acess Location area, like as the control
room or control cabinet. Besides, the device’s surface temperature may caused damage
while the Power over Ethernet function is enabled and under working, at the ambient
temperature 70°C . Therefore, the device should install at the restriced location, like as
Control cabinet to prevent any damage.
Follow the steps below to mount PMI Managed Switch to the DIN-Rail track:
1.
First, insert the DIN-Rail track upper side into the upper end of DIN-Rail clip.
2.
Lightly push the bottom of DIN-Rail clip into the track.
Содержание PMI-110-F2G
Страница 1: ...1 PMI 110 F2G User s Manual Version 3 0 Industrial Managed PoE Switch ...
Страница 5: ...1 5 2 Westermo Private MIB 234 5 3 Revision History 235 ...
Страница 19: ...15 ...
Страница 168: ...164 4 8 3 DSCP Queue Mapping 4 8 4 CLI Commands of the Traffic Prioritization ...
Страница 193: ...189 ...
Страница 234: ...230 Note No CLI command for this feature ...
Страница 240: ...236 ...