18
198846 R12
Figure 3.
Pea Upgrade Kit Assembly
Part Number: 198846
Revision: 8
Upgrade Kits
INSTALLATION AND STORAGE INSTRUCTIONS
Models 145, 146, 147, 148, 195, 196, 197 and 198 Bins on Hopper
These kits can be installed on Model 145, 146, 147, 148, 195, 196, 197 and 198 bins for added
vertical strength when mounted on hopper bottoms. They MUST be used for pea storage on hopper
mounted bins. Bins in this application require additional uprights due to the "mass flow" phenomenon
experienced during unloading. List of Kit parts is shown on the other side of these instructions.
Installation instructions:
Locate the position of additional
uprights as shown on layouts attached.
Install additional uprights using 3/8" x 1"
bolts and nuts at horizontal seams. Use
3/8 washers at slots in uprights. Do not
install the bottom bolts at this time to
ease assembly to the cone.
Using upright as a template drill 3/8
holes in 3 bottom tiers only - spaced
vertically every 10".
Once all bolts have been installed and
tightened, lift the bin into place on the
cone.
Install bin-to-hopper bolts and tighten.
Install the Upright Supports inside the
cone, between uprights and the cone.
Push firmly up into place. Sheet metal
screws are used to install the upright
supports, as shown in the sketch. If
necessary, place steel shims (not
supplied) between the uprights and the
upright supports to ensure full contact
between upright and the support. This is
critical to the strength of the bin.
READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY
BEFORE BEGINNING FOUNDATION OR ASSEMBLY
EFFECTIVE DATE: June, 2015
UPRIGHT SUPPORT ASSEMBLY
BIN ON HOPPER PEA UPGRADE KIT – GRAIN BIN