background image

 Liberty Open - Operator & Maintenance Manual 

4. OPERATING INSTRUCTIONS - CONTROLS

 

4.1 Upper/Lower Landing Call Station (Standard Controls) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Upper landing call 
station is operated simply 
by pressing and releasing 
the rocker call switch. 

The lift will automatically 
travel to where you are. 

(Picture left shows standard 
call station with key switch 
option - at upper level) 

4.2 In Car Internal Standard Controls (2-Stops) 

Emergency Stop

  

To stop the lift in 
the event of an 
emergency, press 
the red 
‘emergency stop’ 
button. 

The button will 
stay locked down.  
The lift will not 
work when the 
stop button is in 
this position. 

To release, twist 
the red button 
clockwise. 

 

 

 

 

 

 

(Picture above shows high spec raised tactile, 

illuminated call buttons) In Car.

 

 

Up Direction

 – Press and 

hold the green arrow to 
make the lift move up. 

(Note:  If you release the 
button the lift will stop). 

Down Direction

 – Press 

and hold the green arrow to 
make the lift move Down. 

(Note:  If you release the 
button the lift will stop).

 

 

Alarm

 – Press and hold the 

‘alarm button’ to sound the 
alarm. 

 

OP00 7100_A.doc 

Page 

8

 of 

34

 

 

Содержание LIBERTY OPEN

Страница 1: ...LIBERTY OPEN OPERATOR MAINTENANCE O M MANUAL Wessex Lift Co Ltd Budds Lane Romsey Hampshire SO51 OHA UK OP00 7100 Revision A October 2013...

Страница 2: ...ovided that such electronic or printed copy of this manual or revision must contain the complete text of this copyright notice and provided further that any unauthorised commercial distribution of thi...

Страница 3: ...all Stations Internal Standard Controls 8 4 2 In Car Internal Standard Controls 2 Stop 8 4 3 Sensitive Safety devices Safety Edges 9 4 4 Gate Interlocks 9 4 5 Operation of the Platform lift Overview 1...

Страница 4: ...ce today Our in depth knowledge of associated building and electrical work and management expertise ensures that the installation of all Wessex Equipment is completed with the minimum of disruption to...

Страница 5: ...r purposes other than those described in the manual Material must not be transported unattended in the lift Components higher than 2 2 metres must not be transported in the lift 2 3 WARNING Overload D...

Страница 6: ...switch as follows 1 Open the pump box enclosure and trip the MCB 2 Switch off the lift units main power switch lock and tag and place a warning sign prominently at each platform lift entrance advising...

Страница 7: ...g the relevant optional extras 3 3 Safety Gear The use of rupture valves prevents the rapid descent of the lift in the event of a hydraulic hose or pump failure 3 4 Platform Sizes OP01 1460 x 800 OP02...

Страница 8: ...stop the lift in the event of an emergency press the red emergency stop button The button will stay locked down The lift will not work when the stop button is in this position To release twist the re...

Страница 9: ...carrier comes into contact with an obstruction the lift will stop The lift can only be restarted once the obstruction has been removed 4 4 Gate Interlocks Notes Latch Plate removed for clarity Gate t...

Страница 10: ...t pressure i e the buttons must be kept depressed throughout the travel If released the platform lift will stop immediately When the platform lift reaches the correct landing it will stop automaticall...

Страница 11: ...the options selected on purchasing the lift Entering Exiting the Lift The lift can be configured to allow the user to enter and exit the lift without the need to reposition their wheelchair or other...

Страница 12: ...in car directional control button wait 3 seconds and then select the new direction of travel button The lift will then move in the new direction Alternatively the original direction of travel can be...

Страница 13: ...e The lift incorporates a facility that will allow the lift to be lowered to the ground floor in the event of a power failure 1 In the event of a power failure the lower Green directional arrow will i...

Страница 14: ...se key in a convenient place in case of an emergency 2 Pull the red solenoid knob and the lift will lower towards the ground releasing the knob will stop the platforms descent When the platform has re...

Страница 15: ...before manually opening the Gate Remove the rubber grommet on the Gate lock infill Align and insert the gate release key provided Twist approximately turn and pull the Gate open Note It is recommende...

Страница 16: ...use ladders to clean the exterior of the lift or the interior panels by balancing ladders on the platform If you wish your lift to be cleaned we recommend that you use a 3rd party contractor or conta...

Страница 17: ...the Gates are closed and interlocked Ensure that the mains power is turned on Ensure that the lift is not isolated via a key switch this will result in the call buttons not being illuminated check la...

Страница 18: ...nd ask for The Customer Care department A member of staff will record details of your request and initiate the necessary actions to resolve the problem Outside normal office hours telephone the emerge...

Страница 19: ...n accordance to BS 6440 2011 standard Annex E which includes but is not limited to the following Interlocking devices Electrical safety devices Earth continuity Supporting and suspensions means for li...

Страница 20: ...riod Months Engineers Name Company Signature Date 3 6 12 1 Year 18 24 2 Years 30 36 3 Years 42 48 4 Years 54 60 5 Years 66 72 6 Years 78 84 7 Years 90 96 8 Years 102 108 9 Years 114 120 10 Years Circu...

Страница 21: ...sure Oil levels seals Guide rails tracks and fixings Hydraulic components Push buttons Batteries Pads and Guides Door mechanism Trailing cables Door Gate Interlocks Wiring and fuses Door locks Isolato...

Страница 22: ...ons If any stated in section 6 what is the safe working load of the lift 9 Other Observations 10 Declaration I We certify that on the date below I we thoroughly examined this lift and that the foregoi...

Страница 23: ...0mm Lift Access Configurations Through Access and LH RH Side Access Clear opening width1 800mm 1460 x 800 900mm 1460 x 900 1460 x 1100 Clear Opening Height Required1 2000mm Light at lifting platform f...

Страница 24: ...on Not regarded as a health or environmental hazard under current legislation 4 First Aid Measures Inhalation Move the exposed person to fresh air at once Get medical attention if any discomfort conti...

Страница 25: ...container 8 Exposure Controls and Personal Protection Ingredient Comments OES Occupational Exposure Standard MEL Maximum Exposure Limit Protective Equipment Ventilation Provide adequate general and lo...

Страница 26: ...Toxicological Information Health Warnings No specific health warnings noted 12 Ecological Information Ecological Information Dangerous for the environment if discharged into watercourses 13 Disposal...

Страница 27: ...R Phrases Full Text R 36 Irritating to eyes R 51 53 Toxic to aquatic organisms may cause long term adverse effects in the aquatic environment Disclaimer The information provided in this document has...

Страница 28: ...hetic Mineral oils are generally low hazard products They may cause slight temporary irritation if splashed in the eye They may cause slight skin irritation following frequent or prolonged skin contac...

Страница 29: ...requirements avoid elevated temperatures Suitable Materials Coatings Most common metals and plastics are suitable for storage Unsuitable Materials Coatings Product may soften some rubbers 9 Reactivity...

Страница 30: ...itation of lung tissue which may give rise to chemically induced pneumonia children are more susceptible than adults Carcinogenicity No carcinogenic effects are normally associated with these products...

Страница 31: ...The use of suitable skin barrier cream can be beneficial Observe good standards of personal hygiene Keep exposure to oil mists and fumes to a minimum 15 Packaging Labelling and Transport Classificati...

Страница 32: ...N Model OP01 OP02 OP03 Enclosed Platform Lift Manufacturer Wessex Lift Co Ltd Address Budds Lane Romsey Hampshire SO51 0HA Telephone No 44 0 1794 830 303 Fax No 44 0 1794 512621 E Mail info wessexlift...

Страница 33: ...lines 1 The Lifting Platform should be thoroughly examined by a technically competent person at intervals not exceeding six months as recommended in EN 81 41 2010 2 Paint work or any other damage iden...

Страница 34: ...5 EC Electromagnetic Compatibility Directive 2004 108 EC Conformity Assessment Procedure As defined in Regulation 13 of Supply of Machinery Safety Regulations 2008 Conformance of a type sample with th...

Отзывы: