Liberty Open - Operator & Maintenance Manual
Fit and mechanically
lock Pit Prop in
Position!
2.6. Safety Actions prior to working on the platform lift.
The lift must
always
be disconnected from the mains supply
using the mains power switch before work or emergency
lowering is started.
Note: Consider lock and tag procedure if there is a risk of
interference by other parties.
Switch of the main power switch as follows:
1.
Open the pump box enclosure and trip the MCB
2.
Switch off the lift units main power switch lock and tag and place a warning sign prominently at
each platform lift entrance advising of work in progress.
2.7. Safety precautions when working under the platform
When working underneath the platform the lift must be run up a least
1 metre (or its maximum height) from the floor level.
The pit prop must now be positioned and fixed mechanically in place.
It is recommended that a safety helmet is worn to protect your head when working under the platform.