SS590
WESMAR
Page II - 13
DO NOT taper the fairing to the hull (this
will drag air bubbles into the soundbeam).
Run metal rods or plates cut at a 45 degree
angle from the fairing to the hull to pre·
vent hang-ups on wire rope or debris.
Cover the bottom of the fairing around the
seachest. This will help prevent turbulence
caused by open cavities.
INSTALLATION NEXT TO KEEL
INSTALLATION AWAY FROM KEEL
Содержание SS590 SERIES
Страница 3: ...INSTALLATION AND OPERATION WESMAR Page I 2 ...
Страница 4: ......
Страница 5: ...INSTALLATION AND OPERATION WESMAR I 3 Page Section I INTRODUCTION ...
Страница 8: ...SS590 Page I 6 WESMAR ...
Страница 9: ...Page II 1 WESMAR SS590 Section II INSTALLATION ...
Страница 16: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Страница 17: ...SS590 Page II 9 WESMAR ...
Страница 18: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Страница 19: ...SS590 Page II 9 WESMAR ...
Страница 22: ......
Страница 38: ...SS590 WESMAR Page II 28 ...
Страница 51: ...SS590 Page IV 1 WESMAR Section IV FIELD ADJUSTMENTS ...
Страница 56: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 6 THIS PAGE LEFT BLANK ...
Страница 58: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 8 ...
Страница 61: ...SS390E WESMAR Page IV 11 CIRCUITBOARD 5 voe MONITOR 021 RECEIVER A DJ ...