Page II - 11
4.0 SEACHEST FLANGE
For metal seachests, the seachest flange must
be made of the same material as the seachest
and welded to the seachest pipe.
See Pages 2-8 through 2-10 for flange
dimensions. A flange is included with
WESMAR's optional fiberglass seachest,
5.0 INSTALLATION POSITION
The seachest must be perpendicular to the
water line.
Attach the seachest to the hull with
standard shipyard procedures. Support
the seachest with gussets or stringers to
minimize vibration.
The bottom of the seachest must be 1cm (.5
inches) above the bottom of the keel.
6.0 FAIRING
This section only applies to seachests that ex-
tend outside the hull.
Build a 1 meter long fairing around the
seachest to reduce turbulence and air
bubbles at high speeds.
Turbulence and air bubbles reduce sonar
performance.
For seachest installations next to the keel,
run fairing from the seachest to the keel in
front and behind.
For installations away from the keel, place
fairing completely around the seachest.
1CM (.5 IN.)
SEACHEST EXTENSION BELOW HULL
Содержание SS590 SERIES
Страница 3: ...INSTALLATION AND OPERATION WESMAR Page I 2 ...
Страница 4: ......
Страница 5: ...INSTALLATION AND OPERATION WESMAR I 3 Page Section I INTRODUCTION ...
Страница 8: ...SS590 Page I 6 WESMAR ...
Страница 9: ...Page II 1 WESMAR SS590 Section II INSTALLATION ...
Страница 16: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Страница 17: ...SS590 Page II 9 WESMAR ...
Страница 18: ...INSTALLATION AND OPERATION WESMAR Page II 8 ...
Страница 19: ...SS590 Page II 9 WESMAR ...
Страница 22: ......
Страница 38: ...SS590 WESMAR Page II 28 ...
Страница 51: ...SS590 Page IV 1 WESMAR Section IV FIELD ADJUSTMENTS ...
Страница 56: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 6 THIS PAGE LEFT BLANK ...
Страница 58: ...INSTALLATION ANDOPERATION WESMAR P a g e IV 8 ...
Страница 61: ...SS390E WESMAR Page IV 11 CIRCUITBOARD 5 voe MONITOR 021 RECEIVER A DJ ...