
25
Ceiling Installation (continued)
Set the Ceiling Stay Performance Angle
Refer to the installation drawings when setting the ceiling stay performance angle.
1. Rotate the ceiling panel row into the storage (vertical) position.
2. Use a pair of 7/16" combination wrenches to loosen (finger tight) all of the hex head screws (four)
and lock nuts on the latch receiver assembly.
3. Slide the latch receiver assembly away from the ceiling stay latch.
Do not tighten the screws.
Hanger Arm
Latch Receiver Assembly
Hex Head Screw
Ceiling Stay Rod
Ceiling Stay
Rod
Note:
Ceiling Panel Row is shown
in the Storage Position
Ceiling Stay Latch
Lock Nut
Upstage Side