Wenger 145V006 Скачать руководство пользователя страница 5

5

S

ECURING THE

C

ABINET

(

S

TO THE

W

ALL

NOTE:

The following instructions are for standard installations. 

For seismic installation instructions, see 145R422.

There are Cabinet Connector Brackets in the hardware bag for securing the cabinets to the 

wall surface. Because of the variety of possible wall surfaces, fasteners for attaching the brackets 

to the wall are not included. Have your maintenance people recommend an appropriate type for safe, 

secure attachment.

NOTE:

Make sure all of the cabinets are secured together before attaching them to the back wall.

1. Using the Cabinet Connector Brackets, the cabinets can be tied together 

and to the wall surface at the top. The brackets have extra holes: 

if the cabinets cannot be positioned tight against the wall, 

the bracket can be slid back as much as 2” until it is tight 

against the wall surface.

Attach the bracket to the cabinet top using two #8 x

5

/

8

” Phillips 

Pan Head Screws.

2. Use the necessary fasteners suggested by your maintenance people 

to secure the cabinets to the wall.

Cabinet Connector

Bracket

Cabinet Top

Back Wall

Cabinets are unsafe unless

secured as specified.

!

CAUTION

Use methods appropriate to

your wall surface.

!

CAUTION

#8 x 

5

/

8

” Phillips 

Pan Head Screws

Содержание 145V006

Страница 1: ...ration using the information below CONTENTS Wenger Corporation 2014 Printed in USA 08 14 Part 145V345 04 Wenger Corporation 555 Park Drive P O Box 448 Owatonna Minnesota 55060 0448 Questions Call USA...

Страница 2: ...direct indirect special incidental or consequential damages resulting from the use or defect of this manual The information in this document is not intended to cover all possible conditions and situa...

Страница 3: ...t approximately in their final position Remove all items from the hardware bag and determine where all of the fasteners will be used Screw Insert 1 4 20 x 5 8 FASTENER PARTS LIST Note Hardware Pack ma...

Страница 4: ...ont edges of the cabinet are plumb front to back 5 Recheck that A B Readjust if necessary repeat steps 2 4 If additional cabinets will be installed 6 Adjust the levelers on the next cabinet so it will...

Страница 5: ...ogether before attaching them to the back wall 1 Using the Cabinet Connector Brackets the cabinets can be tied together and to the wall surface at the top The brackets have extra holes if the cabinets...

Страница 6: ...desired shelf heights The flat edge of the Shelf Support should face up to match the slots in the bottom of the shelf 2 Install the shelves 3 The larger shelf uses six Shelf Supports and is to be plac...

Страница 7: ...wers can be removed by pulling outward Now the cabinet can be leveled according to Leveling the Cabinets 2 Re install the file drawers by aligning the rails that are attached to the file drawer with t...

Страница 8: ...8 This page is intentionally blank...

Отзывы: