7
MECHANICAL INSTALLATION
The following is a step-by-step procedure for installation of the Recirculating Hoods.
1.
Un-crate the downdraft unit, being very careful
not to dent or scratch the outer surface.
2.
NOTE:
Report any damage to the delivering
freight carrier and file a claim if appropriate.
Check the nameplate on the equipment to make
certain it meets the specifications provided by
the architect and or engineer. If discrepancies
exist, notify the manufacturer immediately.
3. It’s important that you have read and understand
“Site Preparation” before continuing with the
installation of the hood.
4.
Determine the exact location of the downdraft
unit.
5.
Place the unit into position.
6.
Complete the assembly of the sneeze guard, on page 6,
to the top of main unit.
7.
Install the side kick plates, with provided screws, to the
main body of the unit.
8.
Install the front and rear kick plates, with provided screws,
to the side kick plate.
9.
Install the inlet filter by placing it in the filter well.
10.
Install the inlet cover by placing it over the inlet filter.
REAR KICK PLATE
SIDE KICK PLATE
FRONT KICK PLATE
INLET FILTER
INLET COVER
ASSEMBLED
SNEEZE GUARD
REAR KICK PLATE
SIDE KICK PLATE
FRONT KICK PLATE
INLET FILTER
INLET COVER
ASSEMBLED
SNEEZE GUARD