POWER-UP SCREENS
Each time the System powers up, a series of numbers is displayed. After the startup sequence of
numbers, the system will enter Priming Mode.
PREPARATION AND FILLING
Fill the spa to its correct operating level. Be sure to open all valves and jets in the plumbing system
before filling to allow as much air as possible to escape from the plumbing and the control system
during the filling process.
After turning the power on at the main power panel, the top-side panel display will go through specific
sequences. These sequences are normal and display a variety of information regarding the configuration
of the hot tub control.
Содержание SAMOA
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 15: ...TROUBLESHOOTING ...
Страница 16: ......
Страница 31: ...1 Phase Line Connection to 1x16A minimum Advice to SAMOA modell ...
Страница 32: ...2 1 Phase Line Connection to 1x25A optimum Advice to SAMOA modell ...