Preparation before installation
1
The control valve can be installed only after the E-box has been installed. For
the installation of the E-box, please refer to the installation guide of E-box.
2
Water pressure: 0.05 Mpa- 1.0 Mpa
Best performance at: 0.05 Mpa-1.0 Mpa
Temperature: 5° C-90° C
Installation guide
1. Stop the water supply. Disassembly
the sealing board from the E-box,
then put the thermostatic control valve
into the E-box as shown. Fix it in the
E-box by tightening the Allen screw.
(Important: make sure to put in all the
sealing ring.)
Содержание Divido
Страница 18: ......