88
Repair Procedures
Welch Allyn Propaq Encore Vital Signs Monitor
•
set the two circuit boards and side panels in place, making sure that the boards
are seated on the support tabs
•
torque screws to 4.75in-lbs to 5.25in-lbs (.54N-m to .59N-m)
•
reconnect the mainstream CO
2
patient connector cable
Replacing the Sidestream CO
2
Assemblies
The following instructions describe how to replace the sidestream CO
2
option assemblies
in the expansion module. These include the sidestream processor (SSP) board, the
sidestream CO
2
“Stick” board, and the extender board.
1.
Loosen the expansion module front chassis (
“Replacing the Expansion Module Front
2.
Disconnect J1 and J3 from the SSP board to completely separate the front chassis.
Replacing the Extender Board
Remove the extender board from the MSP board through the left card slot in the
expansion module.
When reinstalling the extender board, observe P6 connector mating while installing
through the left card slot to ensure proper connection with the MSP board.
Содержание Propaq Encore
Страница 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Страница 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Страница 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...
Страница 130: ...126 Dynatech Nevada Patient Simulator Modification Welch Allyn Propaq Encore Vital Signs Monitor...