Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße.
Copyright HRB 3662
12
4.5. This must be considered during installation!
At least two people are required to assemble the log cabin.
All screw connections are to be pre-drilled in order to avoid damaging the wood parts. The following symbols in
the instructions will indicate when this is necessary:
The intermediate spaces between the floor beams guarantee the necessary subfloor ventilation for the house.
Fit the wall boards together, with the tongue pointing upwards. If necessary, use a rubber mallet. The assembly
timber will prevent any damage to the tongue.
In order to check the right angles, measure the diagonals and make any necessary corrections until you have
the same values.
Do not remove the protective film from both sides of the plastic glazing in the door and window until the entire
cabin has been sufficiently treated with a wood protection agent.
When laying the roof boarding, care should be taken to ensure that the roof boards are not pressed too tightly into
each other. Subsequent swelling of the wood as a result of moisture is unavoidable.
The supplied roofing felt primarily serves as temporary protection against weathering. After one year at the
latest, appropriate action must be taken to ensure permanent protection. The method used (bitumen roof paint,
bitumen shingles, self-adhesive roofing membranes etc.) is dependent on the roof incline and shape of the
product. Please consult a specialist local builder.
If this is not done, your WEKA product may incur damage.
If you have decided to cover your house with bitumen shingles, we recommend that they are laid directly
on the roof boards.
Make sure you remove the film on the bitumen strips before laying!
The wall boards are laterally interchangeable. If the cabin has an off-centre door
opening, you can fit the door in the left or in the right half of the front wall. The
door will always open to the right.
With an asymmetrical roof, the door must be located under the gable peak in
order to ensure that it opens fully with no problems.
The gap between the upper edge of the door frame and the wall board is
intentional. In contrast to the door frame, the wall boards undergo a settling
process over time which makes this gap necessary as an expansion zone. The
cover battens attached to the door frame (under no circumstances to the wall
boards) ensure a clean transition from door frame to the wall boards.
If cabins have wind bracing
Ensure that with such cabins no rigid connections of the individual wall boards
occur beneath each other, e.g. by installing a shelf, a gutter downpipe or similar,
so that these can work unhindered!
The functional efficiency of the wind anchorage is to be inspected twice a
year.
Содержание 213.2424.40010
Страница 12: ...1 2 3 Technische nderungen vorbehalten 12 Copyright HRB 3662...
Страница 20: ...Technische nderungen vorbehalten 20 Copyright HRB 3662 11 13 9 13 31 31 13 11 M3 M3...
Страница 24: ...9 8 2 x 220 M11 Technische nderungen vorbehalten 24 Copyright HRB 3662 M11 6x M11...
Страница 42: ...Notizen Technische nderungen vorbehalten 42 Copyright HRB 3662...
Страница 43: ...Notizen Technische nderungen vorbehalten 43 Copyright HRB 3662...
Страница 110: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 66...
Страница 111: ...Techn nderungen vorbehalten Alle Ma angaben sind ca Ma e Copyright HRB 3662 67...
Страница 118: ...1 Technische nderungen vorbehalten 6 Copyright HRB 3662 H SB H H H H...
Страница 127: ...2 2 x 55 M13 11 Abb 214 0224 40011 Technische nderungen vorbehalten 15 Copyright HRB 3662 2x 6 M13 2x H A A M13 6 3...
Страница 132: ...15 4 0 x 40 M2 A A Abb 214 0224 40011 Technische nderungen vorbehalten 20 Copyright HRB 3662 6x M1 H SB SB H M1 H SB...
Страница 133: ...Notizen Technische nderungen vorbehalten 21 Copyright HRB 3662...
Страница 134: ...Notizen Technische nderungen vorbehalten 22 Copyright HRB 3662...
Страница 135: ...Notizen Technische nderungen vorbehalten 23 Copyright HRB 3662...