Installation and operating instruction
Oil condensing boiler WTC-OB 18-B
7 Commissioning
83311002 1/2018-03 La
60-132
7 Commissioning
7.1 Prerequisite
Commissioning must only be carried out by qualified personnel.
Only correctly carried out commissioning ensures the operational safety.
Prior to commissioning ensure that:
all assembly and installation work has been carried out correctly,
the appliance and heating system have been filled with media and vented,
the siphon has been filled with water,
an adequate supply of fresh air is guaranteed,
flue gas ducts and combustion air ducts are unimpeded,
all regulating, control and safety devices are functioning and set correctly,
a heat demand is available.
Additional system-related tests could be necessary. Please observe the operating
guidelines for the individual components.