Document P/N:
2P42520
Release Date:
07/11/2016
Revision: D
9 of 22
Inspection Continued
f) Soft seals should be inspected for tears or cracks. Seals showing significant wear or damage of any
sort should be immediately replaced.
g) Any part with excessive rust or corrosion that prevents proper assembly or sealing should be
immediately replaced.
h) Parts showing signs of internal washing, corrosion, acid pitting, or rust should be replaced.
i) SPM
®
recommends magnetic particle inspection on SPM
®
Safety Iron
®
clamps
during the periodic re-
inspection for all applications involving strong vibrations.
j) Strings, treating lines, and equipment are recommended to be inspected every six months. SPM
®
also recommends routine hydrostatic tests on all SPM
®
Safety Iron
®
connections and equipment
k) Weld repair is prohibited for SPM
®
Safety Iron
®
products.
Engineering Reference Documents
The following list of SPM
®
Engineering documents serves as guidelines when working with Safety Iron
®
products. It is important that all are adhered to and are completed by a qualified technician.
ENG-051
SPM
®
Safety Iron
®
Clamp Assembly & Union Inspection
ENG-052 SPM
®
Safety Iron
®
Seal Polishing Requirement
2P38163 Inspection and Maintenance
2P36604
Manifold Trailer Operations Guide
BLLT1668
S.I. installed on mobile fixed applications
BLLT1224
S.I. Torque Values
ENG-086
10 Station Manifold Trailer Assembly procedure
Temperature Rating
All Safety Iron
®
products are rated as low-temperature product. Accordingly, they are certified for the below
temperature range:
For other temperature applications, please contact Engineering.
Temperature Ratings
Seal Type
Minimum
Maximum
Buna
-30C (-22F)
100 C ( 230 F)
Viton
-30C (-22F)
160 C (350 F)