background image

Part Number 550-141-816/0798

10

LGB-6 to LGB-20

Series 2 – Control Supplement

1. Remove red (MV) and blue (PV) wires from main gas valve.

2. Close main test firing valve attached to the manifold.

3. Check that both leak test valves are closed and remove plugs.

4. Attach manometer to first leak test valve.

5. Open first leak test valve and check for pressure.

6. Close first leak test valve and remove manometer.

7. Attach manometer to second leak test valve.

8. Apply call for heat to boiler.

9. Check that electronic pilot proves.

10. Open second leak test valve and check for pressure.

11. Close second leak test valve and remove manometer.

12. Remove call for heat to boiler.

13. Reinstall plugs on leak test valves.

14. Connect wiring to main gas valve.

15. Open main test firing valve attached to the manifold.

When checking for pressure at the leak test valves, any small  pressure
reading is normal.  If the pressure continues to increase after opening the
leak test valve, the upstream valve is leaking and should be replaced.

VI

Leak test procedure

Содержание LGB 6-20 Series

Страница 1: ...normaintenancethat are important but not related to personal injury or property damage This Control Supplement must only be used by a qualified installer service technician Read these instructions com...

Страница 2: ...box to interior jacket panel See Figure 6 page 12 Connect thermocouple from standing pilot to switch box Cut 60 pilot tubing into 2 pieces to make connections from pilot valve to pilot switch box and...

Страница 3: ...Part Number 550 141 816 0798 3 CSD 1ControlSystem Propanegas Figure 1 Pilot burner assembly typical Figure 2 Main flame sensor assembly I New installation continued...

Страница 4: ...3 Wire per wiring instructions and wiring diagrams pages 5 9 Add splices as needed 14 Attach a 550 223 710 label at boiler operating instruction label Place so that this label reads first b 550 223 79...

Страница 5: ...any pressure test greater than 13 W C Do not check for gas leaks with an open flame BUBBLE TEST Failure to use bubble test or test for leaks can cause severe personal injury death or substantial prope...

Страница 6: ...WIRE NUTS 4 RESET HIGH LWCO LIMIT MANUAL RESET HIGH LIMIT MANUAL NOTE 8 SIZES 6 THRU 20 NO 1 BASE WIRING SOLENOID SWITCH WHEN USED PRESSURE HIGH GAS NOTE 11 PILOT MV MV PV PV R NOTE 6 W BL NO 1 RED FL...

Страница 7: ...ps 250 V To reset the boiler push the red lockout button V Wiring continued 1 Determine right or left electrical supply wiring 2 Attachelectricaljunctionbox es toinsidejacketend panel Screws and nuts...

Страница 8: ...Part Number 550 141 816 0798 9 CSD 1ControlSystem Propanegas Figure 5 Field wiring diagram...

Страница 9: ...meter to second leak test valve 8 Apply call for heat to boiler 9 Check that electronic pilot proves 10 Open second leak test valve and check for pressure 11 Close second leak test valve and remove ma...

Страница 10: ...ontrol system and any gas control which has been under water Starting boiler 1 STOP Read the safety information above 2 Set the Operating control to lowest setting 3 Turn off all electrical power to t...

Страница 11: ...lot proving module United Technologies 1003 615 511 330 086 10 Main flame proving module United Technologies 1003 60 511 330 085 11 Impulse relay Potter Brumfield S89R 11ABD1 24 510 350 226 12 Push bu...

Отзывы: