Verification testing

Before starting boiler for the first time and at least annually (during annual inspection and
start-up), follow the procedures below to verify boiler controls are operating correctly and
that automatic gas valve properly shuts off gas flow. Failure to verify boiler operation
could result in severe personal injury, death or substantial property damage.

Replace any defective components. Do not attempt to operate boiler or leave boiler in
operation if any component is found to be defective or to operate incorrectly. Failure to
comply could result in severe personal injury, death, or substantial property damage.

Leak test automatic

gas valve

1. Close manual test firing valve.
2. Open the service valve. Press down and turn automatic gas valve knob (or lever) to

ON.

3. Install a hose barb into a pressure tap downstream of the automatic gas valve. Allow

any accumulated gas in the line to vent off. Then connect a U-tube manometer. If the
valve seals properly, there should be no gas pressure present. Remove manometer and
hose barb and replace pipe plug in pressure tap.

4. Remove the manometer and plug any open pressure taps.
5. Follow Operating Instructions to place boiler in service.

Verify boiler control

sequence

1. Follow the Operating Instructions in this Supplement to start the boiler, but 

do not

open the manual test firing valve

. Open all other manual gas valves as instructed.

Leave the manual test firing valve closed.

2. The automatic pilot burner should light.
3. After the pilot lights, the boiler controls should activate the automatic gas valve. Use a

voltmeter to verify voltage to automatic valve.

4. With no gas flow to the manifold, the boiler ignition controls should turn off the

automatic gas valve after main flame ignition trial. Use a voltmeter to verify voltage to
automatic valve is turned off.

Manual test firing

valve

This boiler is equipped with a manual test firing valve — the manual gas valve piped
between the gas manifold and the automatic gas valve. Closing the manual test firing valve
allows verification of proper boiler operation without allowing gas flow to the manifold
and allows leak testing of the automatic gas valve. Follow the procedures below.

Содержание LGB-4

Страница 1: ...6 Verification testing 7 Parts 8 These terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the...

Страница 2: ...ilot burner See Figures 1a and 1b Follow Figure 1b for pilot burner location placing the burner with pilot bracket in the fourth position from the left for the LGB 4 and the fifth position from the le...

Страница 3: ...eg at inlet of gas connection to boiler Where local code utility requires extend drip leg to floor 7 Install ground joint union when required for servicing 8 Support piping by hangers not by boiler or...

Страница 4: ...Part Number 550 141 918 0304 LGB LGB LGB LGB LGB 4 4 4 4 4 5 5 5 5 5 Control Supplement UCS Nat Gas 4 III Wiring...

Страница 5: ...1 The boiler must be electrically grounded according to the National Electrical Code ANSI NFPA No 70 latest edition Use 105o C thermoplastic wire or equivalent if any original wire must be replaced G...

Страница 6: ...Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water 1 STOP Read the safety informatio...

Страница 7: ...If the valve seals properly there should be no gas pressure present Remove manometer and hose barb and replace pipe plug in pressure tap 4 Remove the manometer and plug any open pressure taps 5 Follow...

Страница 8: ...41 918 0304 LGB LGB LGB LGB LGB 4 4 4 4 4 5 5 5 5 5 Control Supplement UCS Nat Gas 8 Weil McLain 500 Blaine Street Michigan City IN 46360 2388 http www weil mclain com Figure 3 Control and gas compone...

Отзывы: