 Control Supplement 

 UCS 

 Nat. Gas

5

Figure 2

Wiring diagram

Sequence of

operation

1. Operating control begins start-up sequence.

a. Limit control contacts are closed.

2. Ignition control module energized.

a. Pilot gas valve opens.
b. Pilot ignition spark begins.
c. Pilot ignites.
d. Pilot proves.
e. Main gas valve opens.
f.

Main burners ignite.

3. Boiler shuts down when operating control

satisfied.

For your safety, turn off power supply before making
electrical connections to avoid possible electrical shock
hazard.

On failure to sense pilot flame, control will wait 5
minutes then retry for ignition.

"Hot" side of line voltage to boiler must be wired
directly to limit circuit, then fed to transformer
primary.

All wiring must be installed according to requirements
of the National Electrical Code and any national, state
or local code requirements having jurisdiction.  All
wiring external to boiler jacket must be N.E.C. Class 1.
The boiler must be electrically grounded according to
the National Electrical Code, ANSI/NFPA No. 70 latest
edition.  Use 105

o

C thermoplastic wire, or equivalent, if

any original wire must be replaced.  GND (burner)
lead wires must be 125

o

C wire.

Canadian installations must conform to CSA C22.1
Canadian Electrical Code Part 1 and any local or
provincial codes.
Wiring to boiler must be No. 14 gauge or heavier.
Install in conduit.
A separate electrical circuit with a fused disconnect
switch (15 amp. recommended) should be used for the
boiler.

Determine right or left electrical supply wiring.

Attach electrical junction box to inside jacket end
panel.  Screws and nuts are provided.

Attach control transformer to junction box.

Complete wiring per wiring diagram, Figure 2,
pages 4 and 5.

Install ignition control ground connection as
shown in Figure 1 and wiring diagram, Figure 2.

In Canada — attach chain between junction box
and transformer with S-hooks.

Wiring

procedure

Wiring

requirements

Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation resulting in servere personal
injury, death or substantial property damage.

Содержание LGB-4

Страница 1: ...6 Verification testing 7 Parts 8 These terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the...

Страница 2: ...ilot burner See Figures 1a and 1b Follow Figure 1b for pilot burner location placing the burner with pilot bracket in the fourth position from the left for the LGB 4 and the fifth position from the le...

Страница 3: ...eg at inlet of gas connection to boiler Where local code utility requires extend drip leg to floor 7 Install ground joint union when required for servicing 8 Support piping by hangers not by boiler or...

Страница 4: ...Part Number 550 141 918 0304 LGB LGB LGB LGB LGB 4 4 4 4 4 5 5 5 5 5 Control Supplement UCS Nat Gas 4 III Wiring...

Страница 5: ...1 The boiler must be electrically grounded according to the National Electrical Code ANSI NFPA No 70 latest edition Use 105o C thermoplastic wire or equivalent if any original wire must be replaced G...

Страница 6: ...Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water 1 STOP Read the safety informatio...

Страница 7: ...If the valve seals properly there should be no gas pressure present Remove manometer and hose barb and replace pipe plug in pressure tap 4 Remove the manometer and plug any open pressure taps 5 Follow...

Страница 8: ...41 918 0304 LGB LGB LGB LGB LGB 4 4 4 4 4 5 5 5 5 5 Control Supplement UCS Nat Gas 8 Weil McLain 500 Blaine Street Michigan City IN 46360 2388 http www weil mclain com Figure 3 Control and gas compone...

Отзывы: