background image

Part Number 550-141-807/0298

11

Flame Guardian WMBC-1A Electronic Pilot System – IRI

V

Sequence of operation

1. Operating control begins startup sequence:

a. Limit control contacts are closed.
b. Purge timer is energized.

2. Flame safeguard control pilot circuit energizes after 2.0 seconds.

a. Pilot gas valve opens.
b. Ignition transformer energizes.
c. Yellow “pilot on” lamp lights.
d. Pilot ignition spark begins.
e. Pilot ignites.
f.

Pilot flame proves.

3. Flame safeguard control energizes main flame circuit:

a. Blue “gas valve on” lamp lights.
b. Gas control train energizes.
c. Downstream gas valve opens to low-fire position.
d. Main burners ignite, operate at low fire.

4. Ignition transformer de-energizes after 10-second trial for ignition.
5. Pilot de-energizes after 10-second trial for main flame.  Yellow “pilot on” lamp goes out.
6. Main flame sensor proves main burner operation at low fire.
7. Flame safeguard control energizes downstream gas valve to high-fire (through firing rate

control, when used):
a. Main burners operate at high fire.
b. Main burners operate at low fire when water temperature or pressure reaches setting of

firing rate control, when used.

8. Boiler shuts down when operating control satisfied.
9. Flame safeguard control lockout circuit energized if pilot is not proved during start-up or if

main flame is not proved during run sequence.
a. Flame safeguard control locks out on safety.
b. Red “alarm” lamp, alarm relay, and alarm bell energize.  Silencing switch can shut off

alarm bell.

c. Alarm relay de-energizes purge timer.
d. Press reset button on flame safeguard control to permit normal start-up after correcting

lockout condition.

e. Normal start-up resumes after purge timer automatically resets (5 minute enforced

wait).

Содержание FLAME GUARDIAN WMBC-1A

Страница 1: ...ds that can cause severe personal injury death or substantial property damage Indicatesspecialinstructionsoninstallation operationormaintenancethat are important but not related to personal injury or...

Страница 2: ...ain recommends installing manual controls in addition to standard as required by local inspector Refer to the LGB Boiler Manual Boiler Controls section a Steam boilers require a manual reset Low Water...

Страница 3: ...WMBC Panel Terminal G2 Ground Terminal Pilot Mounting Bracket 10 32 x 1 4 Machine Screws 2 Main Burner with Pilot Mounting Bracket Compression Union Sensor Lead Burner Support Bar Pilot Line Tubing I...

Страница 4: ...d gas valve w on off actuator 5 Pilot gas pressure regulator 6 Normally open solenoid vent valve 7 Pilot solenoid gas valve 8 Test cock 10 Manual leak checking gas valve 11 Regulating diaphragm gas va...

Страница 5: ...during any pressure test greater than 14 0 inches water column 11 Set gas pressure switches as follows or to local inspector s requirements a Low 3 0 W C b High 14 0 W C II Gas piping Do not check for...

Страница 6: ...Part Number 550 141 807 0298 6 LGB Series2 ControlSupplement Part Number 550 141 807 0298 7 Flame Guardian WMBC 1A Electronic Pilot System IRI Figure 5 WMBC 1A panel wiring schematic...

Страница 7: ...Part Number 550 141 807 0298 8 LGB Series2 ControlSupplement Figure 6 WMBC 1A panel wiring diagram factory wiring...

Страница 8: ...Part Number 550 141 807 0298 9 Flame Guardian WMBC 1A Electronic Pilot System IRI Figure 7 WMBC 1A field wiring diagram...

Страница 9: ...1 2 W C 6 Turn off boiler 7 Remove manometer from manifold and plug the tapping 8 Reconnect the blue wire in the two stage gas valve junction box 9 Turn on electrical power supply and gas supply to b...

Страница 10: ...d trial for main flame Yellow pilot on lamp goes out 6 Main flame sensor proves main burner operation at low fire 7 Flame safeguard control energizes downstream gas valve to high fire through firing r...

Страница 11: ...415 Pilot Burner Honeywell Q179C1009 511 330 181 Pilot Bracket Weil McLain 460 005 624 Main Flame Sensor Honeywell 392956 511 724 274 Main Flame Sensor Bracket Weil McLain 423 300 420 Main Burner with...