9
10
10. Press a 60mm Square Inner Cap (29) into the end
of the Weight Guide Frame (14).
Hold the Weight Guide Frame (14) on top of the
Center Frame (11) and the Weight Guides (9).
Attach the Weight Guides to the Weight Guide
Frame using two M8 x 72mm Bolts (35), four M8
Flat Washers (40), and two M8 Nylon Locknuts (32).
Attach the Weight Guide Frame (14) to the Center
Frame (11) using two M10 x 78mm Bolts (33), two
M10 Flat Washers (41), and two M10 Nylon
Locknuts (31).
33
41
11
14
31
9
35
40
29
40
32
11
11. Locate the High Cable (26), which is the longer of
the two Cables. Notice that there is a single ball on
one end of the High Cable and a metal sleeve on
the other end.
Route the metal-sleeve end of the High Cable (26)
up under the lat bar rest on the Weight Guide
Frame (14), down through the indicated hole, back
up through the next hole, and then down through
the hole between the Weight Guides (9), as shown.
12. Insert the end of the High Cable (26) into the hole
in the center of the Weight Carriage (15). Attach the
High Cable using an M10 x 66mm Bolt (37), two
M10 Flat Washers (41), two 24mm Spacers (42),
and an M10 Nylon Locknut (31).
13. Lift the High Cable (26) in the location shown.
Attach two Pulleys (25) inside the bracket on the
Weight Guide Frame (14) using two M10 x 50mm
Bolts (47) and two M10 Nylon Locknuts (31).
26
12
15
13
31
47
25
26
14
37
41
41
31
9
14
Lat Bar
Rest
26
42
42