17. Slide a Carriage Stop (54) onto a Front Upright
(18).
Be sure that the 60mm Square Bushing
(53) is facing up. Align the holes in the Carriage
Stop with the holes in the Front Upright.
Insert
an M8 x 68mm Bolt (8) through the Carriage Stop
and Front Upright. Tighten an M8 Nylon Locknut
(12) onto the Bolt.
Slide a Weight Carriage (52) onto the Front Upright
(18).
The weight tube must be on the side
shown.
Attach the other Carriage Stop (54) and Weight
Carriage (52) in the same manner.
18. Press two 50mm Square Inner Caps (36) into each
section of the Top Frame (21, 39).
Note: As in step 11, if you will be using an olympic
barbell, assemble the top frame in the wide posi-
tion, as shown in the main drawing. If you will be
using a standard barbell, assemble the top frame in
the narrow position, as shown in the inset drawing.
Attach each section of the Top Frame (21, 39) to
the other Adjustment “U” Bracket (31) with two M8 x
68mm Bolts (8) and two M8 Nylon Locknuts (12).
Do not tighten the Nylon Locknuts yet.
If you are assembling each section of the Top
Frame (21, 39) in the wide position, attach the
Spacer Tube (1) inside the Adjustment “U” Bracket
(31) with two M8 x 68mm Bolts (8) and two M8
Nylon Locknuts (12).
Do not tighten the Nylon
Locknuts yet.
Note: If you are assembling each section of the
Top Frame (21, 39) in the narrow position, store
the Spacer Tube (1), the two extra M8 x 68mm
Bolts (8), and the two extra M8 Nylon Locknuts
(12) in a safe place. If you ever purchase an
olympic barbell, you will need these parts (see
ADJUSTING THE WIDTH OF THE SQUAT RACK
on page 16).
17
18
52
18
53
54
8
12
18
52
54
1
12
12
8
8
8
8
8
39
39
36
36
36
36
21
21
31
31
11