12
19. Attach each section of the Top Frame (21, 39) to
the Front Uprights (18) with an M8 x 68mm Bolt (8),
two M8 Washers (13), and an M8 Nylon Locknut
(12).
Attach each section of the Top Frame (21, 39) to
the Rear Uprights (19) with two M8 x 68mm Bolts
(8), two M8 Washers (13), and two M8 Nylon
Locknuts (12).
Tighten all Nylon Locknuts and Bolts used in
steps 11–19.
20. Attach a Cable (51) to one of the Weight Carriages
(52) with an M10 x 72mm Bolt (10), two Cable
Spacers (45), and an M10 Nylon Locknut (14).
Attach the other Cable to the other Weight Carriage
(not shown) in the same manner.
21. Lubricate an M10 x 90mm Bolt (7). Attach a “U”
Bracket (30) to Top Frame B (39) with the Bolt and
an M10 Nylon Locknut (14).
Do not overtighten
the Nylon Locknut.
Attach the other “U” Bracket to Top Frame A (not
shown) in the same manner
22. Wrap the indicated Cable (51) around a Pulley (24).
Attach the Pulley to the “U” Bracket (30) with an
M10 x 48mm Bolt (9), a Cable Trap (23), and an
M10 Nylon Locknut (14).
The Cable must be rout-
ed around the Pulley from the direction shown.
The Cable Trap should be attached on the out-
side of the “U” Bracket and should be turned to
hold the Cable in place.
Assemble the other Pulley to the other “U” Bracket
(not shown) in the same manner.
20
21
22
14
23
24
51
30
9
45
45
39
14
7—Lubricate
30
10
14
51
52
19
18
18
19
19
39
8
8
13
13
12
8
13
12
12
12
8
13
21