14
English
DISPLAY - AVANTGARDE
1,1 bar 120°C
09:16 09-02-04 1
Boiler pressure
Boiler temperature
Hours
Date
Day of the week
1 - Monday
2 - Tuesday
3 - Wednesday
4 - Thursday
5 - Friday
6 Saturday
7 - Sunday
• during the machine's warm-up phase (roughly 20 minutes), the negative pressure valve will release
steam for a few seconds until the valve itself closes
• before using the machine, run deliveries dry with the filter holder attached for a few seconds to release
any air which may be in the circuit, so that the delivery groups are completely heated
• before using the machine, dispense a few servings of coffee to test the grinding and to check the op-
erating pressure of the machine
i
If the temperature is lower than 90° C (machine warm-up phase), the message
low
appears on the
display.
With the programming key in the
ON
position, the machine can be partially switched off (heating ele-
ment and selections disabled) also by simultaneously pressing the keys for 3 seconds. To
put the machine back in service press again the keys simultaneously for 3 seconds.
i
The preparation of the machine and its installation must be carried out by qualified personnel.
Use of the machine without all the installation operations having been carried out by technical personnel
could damage it seriously.
i
3.
P
reparation of the machine
• Pres in
ON
the main switch
(
A
)
of the machine;
• Wait for possible automatic re-filling of water in the boiler;
• Wait a few seconds longer for the auto-test to be carried out;
test result
- ok -
please wait for
functional test
4.
T
urning on the machine
• The machine is ready for use when the following message is displayed:
A
Содержание Polaris EPU
Страница 1: ...POLARIS instruction manual for user ENGLISH EVD DISPLAY AVANTGARDE page 11 EPU EVD page 5 ENGLISH ...
Страница 4: ......
Страница 29: ......