4
WWW.WEBER.COM
®
LOCATING YOUR BUILT-IN SIDE BURNER
When determining a suitable location for your Built-In Side Burner installation, give
attention to concerns such as exposure to wind, proximity to traffi c paths, and keeping
any gas supply lines as short as possible. Never locate the Summit
®
Built-In Side Burner
in a garage, breezeway, shed, under an unprotected overhang, or other enclosed area.
Locate the Side Burner and structure so there is enough room to safely evacuate the
area in case of a fi re.
CLEARANCE FROM COMBUSTIBLE SURFACES OR STRUCTURES
WARNING: Clearance from the outside walls of the sides and
back of the LP Tank Cabinet must be a minimum of 24 inches
(61 cm) any surface. Refer to “Typical Gas Supply Installation”
before starting installation.
WARNING: The structure, “island” counter tops and adjacent
work areas for the LP Tank Cabinet installation must be built
from noncombustible materials only.
NOTE: If you have questions on what materials are considered noncombustible, contact
you local building supplier or fi re department.
BUILT-IN SRUCTURE CUTOUT DIMENSIONS
All dimensions are to fi nished surfaces.
WARNING: All counter top fi nished surfaces must be
constructed of a noncombustible material.
SIDE BURNER
Cut out Dimensions
Tolerances
A
10 1/2” (26.7 cm)
+ 1/4” - 1/4” (6.35mm)
B
3 3/4” (9.5 cm)
+ 1/4” - 1/4” (6.35mm)
C
16 1/4” (41.3 cm)
+ 1/4” - 1/4” (6.35mm)
1
2
C
A
B
B
B
A
SIDE BURNER LOCATION
A
Any Surface
B
24” (61 cm) From Any Surface
C
Side Burner
1
24” ( 61 cm) Minimum Lid Clearance
2
Note: For a countertop treatment: Recommended 3/4” (19 mm)
overhang. Notch front edge for frame to fully slide in.
GAS INSTRUCTIONS