16
Before starting work
Perform the following tasks before starting to work in order to
prevent failures or excessive wear.
Visual inspections
Rubber buffers for crack formation
Other damage
Other inspections
Check all threaded unions for firm seat
Verify compliance with the maintenance schedule
Switch box VPR
1
2
3
4
5
1 START/STOP
switch
2 POWER
indicator
3 POWER
switch
4 ALERT
indicator
5 ERROR
indicator
Содержание 0105003
Страница 1: ...Operating and Maintenance Manual VPR 450 DC VPR 700 DC 0105003 0105004...
Страница 11: ...11...
Страница 15: ...15 7 8 7 Switch box 8 Power cable 9 Parking brake 9...