2004 SERIES - CHILLER SYSTEMS - OPERATION AND INSTALLATION MANUAL - PAGE : 2
2004 SERIES - CHILLER SYSTEMS - OPERATION AND INSTALLATION MANUAL - PAGE : 2
EDITION DATED 21ST AUGUST 2006
CHILLED WATER AIR-CONDITIONING SYSTEMS
OPERATING AND INSTALLATION MANUAL
CONTENTS
Page
1) General information ...................................................................................................
2) Digital Display <CHILLER CONTROL> ..................................................................
2.1 - Drawing Digital Display - Operation Guide........................................................
3) Central Blower Control ...............................................................................................
4) Visual Error Codes Digital Display ............................................................................
5) Cabin Blower Control .................................................................................................
5.1 - Wiring diagram - <CAB> 230V AC Cabin Control ..........................................
6) Programmable Functions Chiller Condensing Units ..................................................
6.1 - Digital Display - Programming access ...............................................................
7) Pratical Installation of Components - Guidelines .......................................................
7.1 - Installation Drawing - Sea Water Pump system .................................................
8) Chilled Water Circuit Installation ................................................................................
8.1 - Integration of Added Heat-Exchangers in Chilled Water Circuit .......................
Golden Rules - Chilled Water Piping Installation .......................................................
Filling and Purging of a Chilled Water Circuit ...........................................................
Examples of Chilled Water Circuit Piping Schematics ..............................................
8.6 - Example Chilled Water Circuit Piping - Small 20000 BTU Chiller ..................
8.7- Example Chilled Water Piping - WBCP24/D Stern Location - 4 Air-Handlers .
8.8 - Example - Catamaran - WBCP36/D - Central Location - 6 Air-Handlers .........
8.9 - Example - Motoryacht - WBCP72/D Twin - Aft location - 10 Air-handlers .....
8F - Air Ducts - Ventilation ..............................................................................................
9) Routine Checks/Trouble Shooting...............................................................................
11) Wiring diagrams .........................................................................................................
11.1 - Wiring diagram single compressor WBCP12/16/20/24/30 - 1 phase................
11.2 - Wiring diagram single/twin compressor - 1/3 phase .......................................
11.3 - Wiring diagram compressor 3/4 - single and 3 phase .....................................
11.4 - Power Supply Schematics - TWIN/CI Chillers - single phase 230V ..............
11.5 - Power Supply Schematics - TWIN/TRI (3) compr. Chillers - 1 phase 230V .
11.6 - Power Supply Schematics - TWIN/TRI (3) compr. Chillers - 3 phase 400V .
11.7 - Wiring Diagram automatic staging secondary AC loads ..................................
11.8 - Wiring Diagram - Running Capacitors - ECOFIT Blowers ............................
11.9 - Wiring Diagram - Connection 3-Way valve (Lizhan/Zhongli) on TECC card
Webasto AG - Special Products & Markets
Kraillinger Strasse 5,
82131 STOCKDORF,
Germany
Tel. : +49(0) 89 8 57 94 543 Fax : +49(0) 89 8 57 94 753 Website : www.webasto.de
3
3
3
4
4
6
7
9
9
11
11
12
12
13
14
15
15
15
16
17
18
19
20
21
22
23
24
24
25
26
26
26