3
Installation
The product must be installed and maintained by a
VXLWDEO\TXDOLƂHGSURIHVVLRQDOLQFRPSOLDQFHZLWKODWHVW
building/construction and/or electrical regulations and
relevant legislation.
Warning:
Switch off mains electrical supply prior to
installing and connecting the luminaire.
Notice:
,IWKHOXPLQDLUHLVPRGLƂHGE\DQ\ERG\RWKHU
than the original manufacturer, then the warranty will
no longer be valid and shall become the full respon-
sibility of the modifying person/organisation. Claims
based on defects attributable to improper installation
and/or application, and the consequences thereof, are
excluded.
Installation Procedure
1) Switch off the mains electrical supply.
2) Remove cover
A
by releasing screws
B
and pull off
plug
K
from socket
L
.
3) Check that rating shown on luminaire label
conforms with mains electrical supply. Check that
the recess provided can accommodate luminaire
housing.
a) If option involving installation blockout BQR has
EHHQFKRVHQWKHOXPLQDLUHLVƂWWHGE\XVLQJWKH
screws through the thread
M
of the aluminium
frame of the blockout. If necessary use the instruc-
tions accompanying blockout BQR. Ensure the two
nylon plugs
N
remain in position for protection
against insects, dust and water.
b) If option involving cavity in wall has been
FKRVHQGHWHUPLQHSRVLWLRQIRUƂ[LQJVFUHZV
C
. Drill
relevant holes
D
and insert wall plugs
E
.
Warning:
Ensure not to damage any electric cable,
water pipe or other devices while drilling holes.
4) Feed the mains supply cable
F
(and the second
cable
G
for through wiring, if required) through the
grommets
H
at the bottom of the housing, while
VHWWLQJDQGƂ[LQJOXPLQDLUHSRVLWLRQEORFNRXWDRU
cavity (b)).
5) Connect mains supply leads to respective terminals
in terminal block
I
:
a) ON/OFF (L = Phase, N = Neutral, = Earthing)
b) 1-10 V/DALI (L = Phase, N = Neutral,
= Earthing, DA/DA = DALI control line,
D–/D+ = 1-10 V control line).
6) Reconnect plug
K
with socket
L
, reposition cover
A
and tighten screws
B
evenly.