background image

2

Planted Root

ESV4 

300-0461

ESV4 

300-0586

ESV4 

300-0464

ESV4 

300-0459

Suitability

1. KTX234 

2. KTY234 

3. ZFY230

4. GRY224 

5. Short post

Suitability

1. XRY334 

2. XRZ334 

3. RRY334 

4. RRZ334

Suitability

1. CFY259 

2. GRY234

3. RRY324

4. RRZ324

5. XRY324

6. XRZ324

Suitability

1. QSI254

Содержание LTM440-FT

Страница 1: ...nst lightning and electrical surges it is essential to cover mains supply and data input lines at the distribution board level by using respective primary Type 1 and secondary Type 2 surge arrestors i...

Страница 2: ...1 IP55 IK09 Class I ta 40 C Light column LTM440 FT LTM440 494...

Страница 3: ...2 Light Source LED Maintenance Apart from cleaning the outside of the luminaire no special maintenance is necessary Warning Do not open luminaire while mains supply is switched on...

Страница 4: ...It is recommended to incorporate the optional WE EF planted root to ensure maximum stability 1 Switch off mains electrical supply 2 Check that rating shown on luminaire label conforms with mains elect...

Страница 5: ...4...

Страница 6: ...5 Cable connecting box EK70...

Страница 7: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Страница 8: ...WE EF LEUCHTEN Installation and Maintenance Instructions Planted Root ESV4 ESV2 ESV6...

Страница 9: ...300 0586 ESV4 300 0464 ESV4 300 0459 Suitability 1 KTX234 2 KTY234 3 ZFY230 4 GRY224 5 Short post Suitability 1 XRY334 2 XRZ334 3 RRY334 4 RRZ334 Suitability 1 CFY259 2 GRY234 3 RRY324 4 RRZ324 5 XRY...

Страница 10: ...3 Planted Root ESV2 300 9115 ESV6 300 0824 ESV6 300 0457 Suitability 1 PSY414 424 Suitability 1 AML C 2 FLA461 Suitability 1 LTM440 2 LTM444 3 AMW C 4 AMF C 5 AMF S 6 AML C 240 200 600...

Страница 11: ...ate is parallel to the pathway For this installation use 30 mm long M12 bolts supplied 2 Please note ESV4 and ESV6 must be orientated correctly for different products In both instances conduit entry c...

Страница 12: ...ts supplie 7 Place the ESV in the form work for concrete pad ensuring orientation position and levels are correct Ensure all openings on ESV are blanked off including mounting plate hole 8 Fit the nom...

Страница 13: ...paver or concrete Ensure WKDW IRU DQ LQVWDOODWLRQ PRXQWLQJ DQJH PXVW EH XVK RU KLJKHU WKDQ VXUURXQGLQJ VXUIDFH OHYHO IWHU FRQFUHWH KDV FXUHG IRU VSHFL HG WLPH UHPRYH EODQNLQJ DQG EROWV QVWDOO WWLQJ a...

Страница 14: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Отзывы: