7
7) Reposition gear box cover
D
and secure in
position by retighten screws
S
.
5) Feed mains supply cable
E
through cable
gland
G
(Fig. I).
6) Connect mains supply cable
E
leads to
respective terminals in terminal connector
K
:
a) ON/OFF (L = Phase, N = Neutral,
= Earthing)
b) 1-10 V/DALI (L = Phase, N = Neutral,
= Earthing, DA/DA = DALI control line,
D–/D+ = 1-10 V control line).
Tighten cable gland
G
.
Fig. I
8) Loosen screws
H
and
I
slightly. Aim luminaire
in desired direction, retighten screws
H
and
I
.