background image

3

Installation

The product must be installed and maintained by a 

VXLWDEO\TXDOLƂHGSURIHVVLRQDOLQFRPSOLDQFHZLWKODWHVW

 

building/construction and/or electrical regulations and 

relevant legislation.

Warning:

 Switch off mains electrical supply prior to 

installing and connecting the luminaire.

Notice:

,IWKHOXPLQDLUHLVPRGLƂHGE\DQ\ERG\RWKHU

than the original manufacturer, then the warranty will 

no longer be valid and shall become the full respon-

sibility of the modifying person/organisation. Claims 

based on defects attributable to improper installation 

and/or application, and the consequences thereof, are 

excluded.

Minimum Distance

ETC330-GB: No minimum distance.

ETC340-GB: Ensure the minimum distance for objects 

to be illuminated is correct (see illustration 

------

m

  

inside luminaire).

Installation Methods

For proper installation, use the supplied installation 

blockout.

Ensure that proper drainage is provided for the shown 

installation methods:

In landscape areas, soil with gravel base (Fig. I).

In paved areas, concrete with gravel base (Fig. II).

Fig. II

Fig. I

Содержание ETC330-GB LED

Страница 1: ...ion against lightning and electrical surges it is essential to cover mains supply and data input lines at the distribution board level by using respective primary Type 1 and secondary Type 2 surge arr...

Страница 2: ...1 Inground Luminaire IP67 IK10 Class I ta 40 C ETC340 GB ETC330 GB...

Страница 3: ...ecial maintenance work is required Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG D...

Страница 4: ...become the full respon sibility of the modifying person organisation Claims based on defects attributable to improper installation and or application and the consequences thereof are excluded Minimum...

Страница 5: ...ess Phase One Blockout Installation Procedure 3 Set mounting ring B M in position 4 Do not remove screws X from mounting ring M 2 Select appropriate installation blockout holes S for mains supply cabl...

Страница 6: ...n box J 7 Remove screws X from mounting ring M Phase Two Luminaire Installation Electrical Connection and Aiming Procedure 6 Check that rating shown on luminaire label conforms with mains electrical s...

Страница 7: ...locking wheel W Rotate locking wheel W in the 23 1 GLUHFWLRQ ROG QV I to aim horizontally 12 2 Insert screw driver into hole T to aim vertically 10 Set cables and sealable junction box J inside instal...

Страница 8: ...ver into slot on locking wheel W and rotate it in the LOCK direction Use only moderate torque 14 Reposition lens gasket assembly Q and cover P OPEN LO C 30 MIN 16 Tighten screws in criss cross sequenc...

Страница 9: ...fo switzerland we ef com WE EF LIGHTING United Kingdom Tel 44 844 880 5346 Fax 44 844 880 5347 info uk we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP W...

Отзывы: