11
ETC100-GB
BLOCKOUT INSTALLATION:
ATTENTION: PROVIDE PROPER DRAINAGE FOR APPLICATION, A
SOIL PERCOLATION TEST
SHOULD BE
PERFORMED TO DETERMINE IF PROPER DRAINAGE IS PRESENT.
1.
PRIOR TO CONCRETE INSTALLATION, SET THE BLOCKOUT
E/O
IN AN ADEQUATE RECESS IN THE GROUND, ALONG
WITH THE POWER SUPPLY WIRING. THE MOUNTING RING
E
SHOULD BE SET FLUSH WITH THE FINISHED
PAVEMENT, BUT REMAIN AT A HIGHER ELEVATION THAN THE SURROUNDING AREA TO PREVENT WATER FROM
POOLING ON THE FIXTURE AFTER INSTALLATION IS COMPLETE. ARROW
R
SHOULD BE POINTED TOWARDS THE
OBJECT TO BE ILLUMINATED.
Содержание ETC130-GB-CC/TW
Страница 1: ...1 WE EF LIGHTING USA LLC DMX LIGHTING USER MANUAL...
Страница 5: ...5...
Страница 16: ...16 FIXTURE WIRING POWER WIRING...
Страница 17: ...17 DMX WIRING...
Страница 18: ...18 DMX COLOR CODE...
Страница 21: ...21 SYSTEM WIRING EXAMPLE...
Страница 35: ...35 OPTICAL ACCESSORIES...