![WCM CTX8010 Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/wcm/ctx8010/ctx8010_operations-and-parts-manual_878937026.webp)
26
●
Expandable track
●
Others
Pivot between boom and arm; pivot of arm cylinder plunger; pivot at
base of bucket cylinder.
2. Slewing bearing - every 250h
1. Park machine on the flat ground.
2. Lower the bucket onto ground.
3. Idle engine at low speed for 5min.
4. Turn the ignition switch to OFF and then take off thekey.
5. With the upper-structure standing still, add the grease into the two grease nipples.
6. Start up engine to lift the bucket free from the ground, and then swing the upper-structure by 45 degree (1/8
cycle).
7. Lower the bucket onto ground.
3. External meshing gear 45 of slewing bearing ---- every 500h
Содержание CTX8010
Страница 1: ...1 CTX8010 MINI EXCAVATOR OPERATION PARTS MANUAL ...
Страница 4: ...4 Quick hitch Narrow bucket Log grab Mechanical thumb Auger Ripper Rake ...
Страница 5: ...5 Section II Main performance parameters ...
Страница 13: ...12 Main pump ...
Страница 15: ...14 Section IV Schematics of main valve ...
Страница 16: ...15 Section V Electrical system diagram ...
Страница 33: ...31 22 Lower the bucket onto the ground 23 Turn off the engine Unplug the ignitionkey ...
Страница 52: ...48 ...