INSTALLATION MANUAL

5

Submersible Sewage 
Pumps

1

3

5

2

7

6

4

8

9

10

11

1.  Check Valve

7. Switch

2. Union

8.  Minimum Diameter 

3.  Discharge Pipe

9.  Minimum Depth (24 in)

4.  Inlet Pipe

10.  Gasket/Basin Lid

5.  Basin/Septic Tank

11.  Vent Pipe

6.   Pump 

ON LEVEL  

(T50SW-APPROX. 19 IN.
F50SW-APPROX. 13 IN.)
 

OFF LEVEL 
(T50SW-APPROX. 10-1/2 IN.
F50SW-APPROX. 8 IN.)

11 IN. DIAMETER MIN.(F50SW)

18 IN. DIAMETER MIN. (T50SW, 200SW, 100SW, 75SW)

TYPICAL SEWAGE INSTALLATION

1.  This installation must be in accordance with the National 

Electric Code and all applicable local codes and 
ordinances.

2.  Use a basin that is large enough to accommodate the 

pump. The basin diameter should be a minimum of 18 
inches and the depth a minimum of 24 inches.

3.  Clean the basin of all debris. 

4.  Set the pump on a solid, level surface. Do not place pump 

directly on clay, earth, gravel, or sand. A brick or block may 
be installed under the pump to provide a solid base.

5.  Position pump in the basin so the switch is away from 

incoming water. Verify the float switch has at least 1 inch 
clearance to the side wall of the basin and is free of any 
possible obstructions.

6.  Install discharge plumbing according to local, regional and 

state codes. Do not reduce the discharge pipe size below 
that which is provided on the pump.

7.  If optional control device or float is used, follow mounting 

instruction supplied with device or float. 

8.    A union should be installed above the basin to allow easy 

removal of the pump for cleaning and service.

9.  Install a check valve (required) to prevent back-flow. 

It should be installed above the union.

10.  A gate valve or ball valve should be installed above the 

check valve as required by local, regional or state codes.

11.  Connect remaining discharge pipe. The remainder of 

the discharge line should be as short as possible with a 
minimum number of turns.

12.  A vent pipe is required. It removes gases and odors and 

should be installed as required by local, regional or state 
codes.

13.  Secure power supply cord to discharge pipe using cable or 

zip ties to prevent possible switch entanglement. 

14.  Connect pump power supply cord to a ground fault circuit 

interrupter (GFCI) receptacle.

15.  Fill the basin with water. The pump will start when the 

water level has reached the switch-on level. Verify the 
pump is operating normally.

16.  Install a basin cover and gasket to prevent debris from 

falling into the basin, prevent personal injury and to contain 
gases and odors.

*The pump shown in the diagram above is for illustration purposes only. All 

models (T50SW, F50SW, 200SW, 100SW, and 75SW) can follow this diagram 

and the sewage installation tips.

 

Содержание T50SW

Страница 1: ...l DISCHARGE 2 in NPT T50SW F50SW 3 in NPT supplied 2 in Adapter 200SW 100SW 75SW Sewage Pump www blueangelpumps com PERFORMANCE Model HP Discharge Head 5 ft 10 ft 15 ft 20 ft T50SW 1 2 Gal hr 7680 660...

Страница 2: ...ment mise la terre FOR ADDED SAFETY the receptacle must be protected with a ground fault circuit interrupter GFCI All wiring must be performed by a qualified licensed electrician and comply with the N...

Страница 3: ...ACHEMINEMENT D EAU DESTIN E LA CONSOMMATION Ne pas utiliser la pompe pour transporter de l eau qui sera utilis e comme de l eau potable destin e la consommation La pompe doit tre utilis e uniquement...

Страница 4: ...PUMP SHOULD BE USED when risk of property damage from high water levels exists UNE ALARME AUTONOME DE NIVEAU D EAU LEV OU UNE POMPE DE SAUVEGARDE DOIVENT TRE UTILIS ES en cas de risque de d g ts mat...

Страница 5: ...discharge pipe size below that which is provided on the pump 7 If optional control device or float is used follow mounting instruction supplied with device or float 8 A union should be installed above...

Страница 6: ...n of switch 3 Remove obstruction in discharge piping 4 Contact an electrician TROUBLESHOOTING WARNINGS ALWAYS DISCONNECT THE PUMP FROM POWER SUPPLY before installing servicing or making any adjustment...

Страница 7: ...Replace tether switch 2 Remove obstruction to verify free motion of switch 3 Remove obstruction in discharge piping 4 Contact an electrician Pump operates noisily or vibrates excessively 1 Worn bearin...

Страница 8: ...p Check in on your sewage pump and reset the GFCI if necessary Ensure the pump itself is standing upright Vibrations during operation can cause it to fall or tilt onto one side This can jam the float...

Страница 9: ...t cover Products which have been damaged as a result of accident abuse misuse neglect improper installation improper maintenance or failure to operate in accordance with Blue Angel Pumps written instr...

Страница 10: ...__________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _...

Страница 11: ...__________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ _...

Страница 12: ...12 www blueangelpumps com...

Отзывы: