17
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
Tools Needed:
iNST
alla
Tio
N
16
17
Torsion end bearing brackets
imPoRTaNT:
RIGhT AND LEFT hAND
IS ALWAYS DETERMINED FROM INSIDE
ThE GARAGE LOOKING OUT.
End bearing brackets are right and left.
Using the upper slots in the end bearing
bracket, position above the flagangle and
secure the end bearing bracket to the
horizontal angle using
(2) 3/8”- 16 x 3/4” hex head bolts and (2)
3/8”- 16 hex nuts.
Once the bracket is secured to the horizontal
angle, secure the top of the end bearing
bracket to the jamb using (2) 5/16” x 2” lag
screws. Repeat for other side.
Power Drill
7/16” Socket
Driver
9/16” Socket
Ratchet Wrench
9/16” Wrench
Step Ladder
LEFT END BEARING
BRACKET
hORIzONTAL ANGLE
(2) 5/16” x 2”
LAG SCREWS
(2) 3/8”- 16 x 3/4”
hEx hEAD BOLTS
(2) 3/8”- 16
hEx NUTS
center bearing bracket
Power Drill
7/16” Socket
Driver
Level
Tape Measure
Pencil
1/4” Torx Bit
Step Ladder
Measure to locate the center of the door and
mark a vertical pencil line on the mounting
surface above the door, to indicate the center
line of the door. Then, measure from the center
of the bearing, in one of the end bearing
brackets, DOWN to the top of the door. Using
that dimension, measure UP from the top of
the door and mark a horizontal pencil line on
the mounting surface, intersecting the vertical
pencil line. Now align the edge of the center
bearing bracket along the vertical pencil line
on the mounting surface. Center the bearing
bracket on the horizontal line. This will ensure
the torsion tube is level between the center
and end bearing brackets. Attach the center
bearing bracket, in this location, to the mounting
surface, using (2) 5/16” x 2” lag screws and
(1) 5/16” x 2” tamper-resistant lag screw.
imPoRTaNT:
USE ThE 5/16” x 2” TAMPER-
RESISTANT LAG SCREW ONLY IF MOUNTING
SURFACE MOUNTED OVER MASONRY.
TAMPER-RESISTANT LAG SCREW MUST BE
ATTAChED ThROUGh ThE BOTTOM hOLE
OF ThE CENTER BEARING BRACKET.
VERTICAL LINE
MOUNTING SURFACE
EqUAL DISTANCE
CENTER OF END
BEARING BRACKET
hORIzONTAL
LINE
CENTER BEARING
BRACKET
CENTER
BEARING
BRACKET
(2) 5/16” x 2”
LAG SCREWS
MOUNTING
SURFACE
hORIzONTAL LINE
VERTICAL
LINE
(1) 5/16” x 2”
TAMPER-RESISTANT LAG SCREW
OR (1) 5/16” x 2” LAG SCREW